Corrective Action Plan (CAP) - Progress Tracker

Corrective Action Plan (CAP) - Progress Tracker

As of May 20, 2016
Federal Transit Administration (FTA)
Safety Management Inspection (SMI)

 
WMATA Hazard
Risk Category*
Description CAP #s
  I   Unacceptable: The hazard must be migrated in the most expedient manner possible. 0
  II   Undesirable w/ Executive Safety Committee (ESC) decision required: - The hazard must be mitigated. If necessary, the Chief Safety Officer may develop interim mitigations in coordination with the ESC, subject to FTA approval. 50
  III   Acceptable w/ review: The Chief Safety Officer must determine if the hazard is adequately controlled or mitigated as is. 18
  IV   Acceptable w/o review: The hazard does not need immediate mitigation, but corrective actions are monitored. 23
* In accordance with FTA requirements, WMATA's Hazard Risk categories are expressed in terms of severity and probability of occurance. This is used as a safety management tool for mitigating hazards to the lowest practicable level.
Actionable Item Status
Completed   Submitted In Progress   In-Progess Not Started   Not Started

CAP Status Abbreviations
OOpen AIAwaiting FTA's Inspection
O/PDOpen/Past Due ACAddressing FTA Comments
URUnder FTA Review CClosed

CAP # Summary of Metro Actions WMATA
Hazard
Risk
Category
Original
Estimate to Request
Closure
CAP
Status
Total
Action
Items
Action Items
Submitted
Progress Bar Status
FTA SMI Corrective Action Plan 732 485 progress=27&PercentComplete=65
Metro Rail 636 435
Category 1 - Inadequate Rail Operations Control Center Staffing and Procedures 138 86 progress=31&PercentComplete=60
FTA-Rail-1-1-a
WMATA must fully staff the Rail Operations Control Center (ROCC)
CompletedWMATA recruited qualified candidates for employment in the ROCC.
CompletedCandidates completed the orientation.
In ProgressWMATA is conducting internal safety audit to verify the acceptable staffing level.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Aug 2016 O 10 6 progress=30&PercentComplete=60
FTA-Rail-1-2-a
WMATA must complete and maintain required annual re-certifications for Rail Traffic Controllers
CompletedWMATA developed list verifying annual certification.
In ProgressWMATA is developing a new rigorous certification program and a system to track the certification progress.
In ProgressNew audit policy is being developed to provide guidance for maintaining compliance with FTA action.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Jul 2017 O 10 2 progress=60&PercentComplete=20
FTA-Rail-1-3-a
WMATA must establish a program to provide each Rail Traffic Controller (RTC) with mandatory road days for territory familiarization and to keep up with changing system elements
CompletedWMATA developed schedule for RTCs to participate in the ride along program.
In ProgressWMATA is developing a formal and specific criteria for the ride along program.
In ProgressWMATA performed an audit to ensure compliance and a new audit policy will be implemented to provide guidance for compliance.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  III   Dec 2016 O 6 2 progress=50&PercentComplete=33
FTA-Rail-1-3-b
WMATA must require all Rail Traffic Controllers to obtain and maintain Level 4 Roadway Worker Protection (RWP) training and certification
CompletedPolicy letter developed by WMATA requiring all RTCs to certify and maintain level 4 RWP certificates.
In ProgressWMATA is providing level 4 RWP training to rail traffic controllers.
In ProgressWMATA performed audit to ensure compliance and new audit policy will be implemented to provide guidance for compliance with FTA actions.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Dec 2016 O 5 2 progress=40&PercentComplete=40
FTA-Rail-1-4-a
WMATA must complete its assessment regarding the identification of critical versus non-critical notifications and alarms in the ROCC, and options for removing non-critical notifications must be implemented
CompletedWMATA developed list of questionable alarms.
CompletedA new procedures was implemented authorizing personnel to sign off on the alarms that have been removed or transitioned to events.
CompletedWMATA developed guidance to improve the identification, tracking, and correction of alarms defects.
CompletedWMATA performed a quality assurance audit to review actionable items.
  II   July 2016 C 4 4 progress=0&PercentComplete=100
FTA-Rail-1-4-b
WMATA must conduct an engineering assessment, and implement the results, regarding options to reduce noise in the ROCC, including ambient noise and feedback from the radio system
CompletedWMATA analyzed noise assessment and recommended solutions based on industry best practices.
In ProgressWMATA completed the radio analysis and is implementing the findings of the engineering assessment.
In ProgressFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Jan 2017 O 7 5 progress=14&PercentComplete=71
FTA-Rail-1-4-c
Until such time as electronic records of train movement are readily available to on-duty Rail Traffic Controllers, WMATA must ensure that its Rail Traffic Controllers maintain a paper- based record of all mainline train movements, signal by- passes, and unusual movements
CompletedWMATA developed new procedures for reporting delays and unusual movements.
CompletedWMATA developed AIM printout reports and a system for maintaining paper logs.
CompletedA schedule and budget for the AIM upgrade was developed.
CompletedWMATA performed a quality assurance audit to review actionable items.
  III   Dec 2015 C 25 25 progress=0&PercentComplete=100
FTA-Rail-1-5-a
WMATA must ensure Rail Traffic Controller workload and distraction do not interfere with the safe and efficient movement of trains
CompletedWMATA assessed daily tasks and workloads.
CompletedWMATA updated tasks allocation and duty descriptions including guidance for interaction with each other.
In ProgressWMATA is studying options to reduce distractions and distribute workload evenly.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   April 2016 O 6 4 progress=17&PercentComplete=67
FTA-Rail-1-6-a
WMATA must establish and enforce a proper protocol for language and terminology that is used over the radio – to include 100 percent word-for-word read-back for safety-related instructions and unusual train movements
CompletedWMATA assessed radio communications issues.
CompletedWMATA provided comprehensive radio communication training to RTCs personnels.
In ProgressWMATA is conducting semi-annual of radio communication training.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Dec 2016 O 6 3 progress=33&PercentComplete=50
FTA-Rail-1-6-b
As part of the radio protocol required in R-1-6-a, WMATA must establish an approach for communicating and managing all speed restrictions that requires two-way communication between the ROCC and train operator and takes full advantage of available electronic AIM system features
CompletedWMATA developed a new radio communication course for ROCC and train operators.
CompletedWMATA developed a list of capabilities of the AIM system and new procedures for manual speed restrictions and communications with trains.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Dec 2016 O 5 4 progress=0&PercentComplete=80
FTA-Rail-1-7-a
WMATA must establish procedural checklists for Rail Operations Control Center staff to implement the Standard Operating Procedures attached to the Metrorail Safety Rules and Procedures Handbook (MSRPH)
CompletedWMATA developed a graphical training aid for RTCs and updated course instruction.
CompletedA checklist was being developed for ROCC, ROIC and MOCC and procedures were being reviewed by WMATA.
In ProgressWMATA will conduct testing to assess the usage of checklists.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
Note: Work is ongoing, with an estimated CAP closure request date of June 2016
  III   Feb 2016 O/PD 10 8 progress=10&PercentComplete=80
FTA-Rail-1-7-b
WMATA must enhance RTC reference materials to direct internal operations at the ROCC, including the use of the Advanced Information Management system, visual schematics of WMATA stations and facilities, and internal ROCC administrative policies and procedures
CompletedWMATA developed standard operating procedures and checklists.
CompletedWMATA developed a visual training aid for RTCs.
In ProgressWMATA is developing complete publication library for ROCC personnel.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  IV   Dec 2016 O 4 2 progress=25&PercentComplete=50
FTA-Rail-1-8-a
WMATA must establish a clear policy that prohibits distractions from the use of cell phones and other electronic devices in the Rail Operations Control Center
CompletedWMATA instituted a new zero tolerance policy for cell phone usage and signs were installed at all entrances.
CompletedWMATA conducted internal audit to ensure compliance with the policy and incident report of violations was developed and submitted.
CompletedFinally, WMATA has performed a quality assurance audit to review actionable items.
  II   Dec 2016 O 5 5 progress=0&PercentComplete=100
FTA-Rail-1-9-a
Until such time as electronic transfer records are implemented, WMATA must ensure that its Rail Traffic Controller use paper- based logs with formal signatures
CompletedWMATA developed a new briefing procedures and distributed a new policy guidance.
CompletedA new shift change schedule was established and inspections were conducted to ensure compliance.
In ProgressFinally, WMATA is performing a quality assurance audit to review actionable items.
  IV   Jul 2016 O 5 4 progress=20&PercentComplete=80
FTA-Rail-1-10-a
WMATA must establish an on-going "efficiency" testing program for Rail Traffic Controllers to evaluate their in-service performance and competency
CompletedWMATA developed new testing procedures and team event to identify strengths for RTCs.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  IV   Jul 2016 O 3 2 progress=0&PercentComplete=67
FTA-Rail-1-11-a
WMATA must establish an independent committee to evaluate and monitor the recruitment of Rail Traffic Controller trainees, the quality and performance their training, and the certification of new candidates
CompletedWMATA formed a new committee to observe training programs and to give feedback.
CompletedWMATA developed detailed report about the quality of applicants.
In ProgressFinally, WMATA is performing a quality assurance audit to review actionable items.
  III   Jul 2016 O 3 2 progress=33&PercentComplete=67
FTA-Rail-1-12-a
WMATA must overhaul, correct, revise and improve its training program for Rail Traffic Controllers
In ProgressWMATA conducted the assessment of training program and will develop new training program.
In ProgressWMATA is defining statement for Mentorship program and conducting compliance reviews of updated program.
In ProgressWMATA is also developing a schedule of the training program.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  IV   July 2016 O 6 2 progress=50&PercentComplete=33
FTA-Rail-1-12-b
WMATA must establish performance standards to be qualified for all positions in the Rail Operations Control Center
CompletedWMATA has developed performance standards.
In ProgressWMATA is conducting a psychological test and profile built around FAA model.
In ProgressWMATA is developing evaluation metrics and training.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
Note: Work is ongoing , with an estimated CAP closure request date of August 2016
  II   Feb 2016 O/PD 5 1 progress=60&PercentComplete=20
FTA-Rail-1-13-a
WMATA must expand the focus of its accident investigation process to include an active review of the actions of the ROCC, and to ensure that RTCs whose performance could have contributed to the accident are taken for mandatory post- accident drug and alcohol testing as per 49 CFR Part 655.44
CompletedWMATA submitted the documentation detailing the process of accident investigation and quality audit report.
CompletedWMATA performed a quality assurance audit to review actionable items.
In ProgressWMATA is addressing FTA Comments.
  II   Dec 2015 AC 3 3 progress=100&PercentComplete= 0
FTA-Rail-1-14-a
WMATA must expedite activities underway to modify the radio system design to add coverage to the areas that currently are not part of the system design, including tunnel ventilation and fan shafts, safe and refuge areas, and tunnel portals.
In ProgressWMATA is updating radio outage maps and will develop communications procedures during an outage.
In ProgressWMATA is collecting radio coverage data and will update procedures for MOCC response.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Jan 2017 O 5 0 progress=80&PercentComplete= 0
FTA-Rail-1-14-b
WMATA must assess and prioritize for additional radio enhancements not covered by Capital Improvement Plan (CIP) 136
In ProgressWMATA is updating radio outage maps and developing radio coverage reports with schedule for improvements.
In ProgressWMATA is developing long-term strategic plan for radio enhancements and maintenance.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  III   Jan 2017 O 5 0 progress=80&PercentComplete= 0
Category 2 - Ineffective Training, Operational Testing and Rules Compliance Programs   185 120 progress=15&PercentComplete=65
FTA-Rail-2-15-a
Each WMATA Department with Roadway Worker Protection- trained and qualified employees must coordinate with Technical Skills & Maintenance Training to get or establish an accurate status on each employee's refresher and requalification training
CompletedWMATA revised RWP standard operating procedures and assembled a list of all active RWP certified employees.
CompletedWMATA conducted independent audit and distributed the findings.
CompletedWMATA performed a quality assurance audit to review actionable items.
  II   Apr 2016 UR 8 8 progress=0&PercentComplete=100
FTA-Rail-2-15-b
Each WMATA employee with lapsed refresher training or requalification must repeat the initial training and qualification for his or her level as specified in WMATA's roadway worker protection training program
CompletedWMATA assembled a list of out of compliance employees and developed prioritized schedule for training.
CompletedWMATA revised RWP standard operating procedure mitigations.
In ProgressWMATA is conducting an audit to ensure compliance.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Oct 2017 O 11 9 progress= 9&PercentComplete=82
FTA-Rail-2-15-c
WMATA's Information Technology Department must work with Technical Skills & Maintenance Training to develop a long-term solution to tracking employee status and ensuring that Computer-Based Training records, classroom records and employee records are accessible to all departments
CompletedWMATA developed requirements for employee training record tracking and Enterprise Learning Management (ELM) shortcomings.
CompletedWMATA developed short term standard operating procedures.
In ProgressWMATA is developing a long-term project plan.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  IV   Sep 2019 O 11 5 progress=18&PercentComplete=45
FTA-Rail-2-15-d
WMATA must include annual Roadway Worker Protection refresher and requalification time in overall work scheduling protocols and requirements
CompletedWMATA developed business safety plans based on list of out of compliance employees.
CompletedWMATA established quarterly schedule for training classes.
CompletedWMATA conducted quarterly safety audit.
CompletedWMATA conducted a quarterly briefing.
In ProgressWMATA is conducting an audit to ensure compliance.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Sep 2016 O 8 6 progress=13&PercentComplete=75
FTA-Rail--2-16-a
WMATA must conduct a coordinated study to prioritize technical training needs for maintenance personnel, and operations training for Rail Traffic Controller, Train Operators, and Field Supervisors
CompletedWMATA developed a procedure describing the approach.
In ProgressWMATA is revising the training plan for ROCC and frontline personnel.
Not StartedFinally, WMATA will a quality assurance audit to review actionable items.
  IV   Aug 2017 O 5 2 progress=20&PercentComplete=40
FTA-Rail-2-16-b
WMATA must eval. whether re-organization or consolidation of training functions would improve the agency's ability to manage, sch., budget for, develop, oversee and assess training and ensure that training material remains up-to- date
CompletedWMATA adopted a new consolidated organization and developed an organization chart including new job descriptions.
CompletedWMATA developed standard operating procedures.
CompletedWMATA conducted meetings with management and training team to incorporate feedback.
CompletedFinally, WMATA performed a quality assurance audit to review actionable items.
  IV   May 2016 UR 7 7 progress=0&PercentComplete=100
FTA-Rail-2-16-c
WMATA must establish a comprehensive training program to communicate the new "Fire Life Safety (FLS) 1000 - Inspection, Testing and Maintenance Procedure" to WMATA Operations and Maintenance personnel
CompletedWMATA established guidelines to develop a comprehensive training program.
In ProgressWMATA will develop a final training curriculum and standard operating procedures.
In ProgressOnce completed, training plan will be rolled out to maintenance personnel.
Not StartedFinally, WMATA will a quality assurance audit to review actionable items.
  III   Jun 2017 O 5 2 progress=20&PercentComplete=40
FTA-Rail-2-16-d
WMATA must est.formal guidance for maintenance employees responsible for providing on-the-job training
CompletedWMATA documented steps taken to obtain mentor best practice guidelines from industry experts.
CompletedWMATA drafted a mentor guidelines and training curriculum.
CompletedWMATA finalized the mentor guidelines and curriculum.
In ProgressWMATA is creating mentor training class schedules.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Jun 2016 O 5 3 progress=20&PercentComplete=60
FTA-Rail-2-17-a
WMATA's OEM must conduct a formal review of the Metrorail Safety Rules and Procedures Handbook, the supporting Standard operating Procedures, and the new checklists and tools developed by the ROCC to ensure conformance with WMATA's emergency plans
CompletedWMATA provided rules and procedures to office of Emergency Management (OEM).
CompletedWMATA submitted OEM maintenance cycle process and departmental task force agenda and minutes.
CompletedWMATA submitted SOP annual review to FTA.
CompletedWMATA finalized rules and procedures and updated source documents.
In ProgressFinally, WMATA is performing a quality assurance audit to review actionable items.
  III   Mar 2017 O 11 9 progress= 9&PercentComplete=82
FTA-Rail-2-17-b
WMATA's Office of Emergency Mgmt must conduct a formal review of all training provided to frontline, supervisory and ROCC per regarding the actions required to be performed during an emergency to ensure its conformance with WMATA's emergency plans and the understanding of local jurisdictions
CompletedWMATA provided rules and procedures to office of Emergency Management (OEM).
CompletedWMATA provided FTA with quarterly update on the GAP analysis.
CompletedOEM developed GAP analysis assessment and implementation plans.
CompletedFinally, WMATA performed a quality assurance audit to review actionable items.
  III   May 2016 UR 6 6 progress=100&PercentComplete=100
FTA-Rail-2-17-c
WMATA must establish an approach for delivering updated emergency response training to front-line Train Operators, Supervisors, Stations Managers, Rail Traffic Controllers, and other personnel
CompletedWMATA developed a schedule of exercises for first responders.
CompletedWMATA developed a training plan to incorporate an emergency training module.
In ProgressWMATA will develop computer based training modules and rail incident training modules.
In ProgressWMATA is developing automated emergency training tracking.
In ProgressWMATA will then conduct an internal safety audit to ensure compliance and will provide update to FTA on quarterly basis.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Jun 2017 O 10 2 progress=60&PercentComplete=20
FTA-Rail-2-17-d
WMATA must review & update its approach to providing familiarization training to local emer responders, & ensure that they have ample oppor. to learn and practice activating and using fire life safety equip and sys, incl ventilation fans, fire suppression sys, standpipes, comm equip, and other system
CompletedWMATA developed 3-year exercise schedule.
CompletedWMATA participated in the revision of emergency procedures policies.
CompletedWMATA ensured that the jurisdictions have actively participated in training.
CompletedWMATA submitted the analyis on emergency training tracking.
CompletedWMATA submitted the quality assurance audit to review actionable items.
In ProgressRevision of emergency training tracking is in progress per FTA review with revised estimate date to request closure of December 2017
  II   Oct 2015 C 5 5 progress=40&PercentComplete=60
FTA-Rail-2-17-e
WMATA must test its backup Rail Operations Control Center on a quarterly basis and demonstrate the ability to safely control train traffic
CompletedWMATA revised COOP plan and reviewed COOP plan for compliance.
CompletedWMATA published revised COOP plan and conducted a drill.
CompletedWMATA internal safety audit was conducted to ensure compliance
CompletedFinally, WMATA performed a quality assurance audit to review actionable items.
  III   Jan 2016 C 7 7 progress=0&PercentComplete=100
FTA-Rail-2-18-a
WMATA must require Rail Supervisors to complete meaningful rules checks on Train Operators, not just single observation items, unless directed as part of a special emphasis program
CompletedWMATA assessed quarterly progress.
CompletedWMATA developed operations administrative policies for rail supervisors.
CompletedWMATA developed automated rule check application for the hand held device.
CompletedWMATA revised supervisor training program and Office of Emergency Management will provide feedback.
Not StartedWMATA will than finalize the training program and will conduct internal safety and rail audit.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  III   Dec 2016 O 10 5 progress=20&PercentComplete=50
FTA-Rail-2-18-b
WMATA must establish documentation and a training program to ensure that Rail Supervisors know how to conduct and record meaningful rules checks of Train Operators, and how to discuss results with Train Operators
CompletedWMATA assessed quarterly progress.
CompletedWMATA developed operations administrative policies for rail supervisors.
CompletedWMATA developed automated rule check application for the hand held device.
CompletedWMATA revised the supervisor training program and Office of Emergency Management will provide feedback.
Not StartedWMATA will then finalize the training program and will conduct internal safety and rail audit.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  IV   Dec 2016 O 10 5 progress=20&PercentComplete=50
FTA-Rail-2-19-a
WMATA must develop a formal operations testing program to include active, fail-safe testing of all employees responsible for operating or directing the safe movement of trains
CompletedWMATA WMATA assessed quarterly progress.
CompletedWMATA developed operations administrative policies for rail supervisors.
CompletedWMATA developed automated rule check application for the hand held device.
CompletedWMATA revised supervisor training program and Office of Emergency Management will provide feedback.
Not StartedWMATA will then finalize the training program and will conduct internal safety audit.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Dec 2016 O 9 5 progress=11&PercentComplete=56
FTA-Rail-2-19-b
WMATA must document operational testing requirements and test results to improve the utility of the program as part of a robust testing and observation program
CompletedWMATA assessed quarterly progress.
CompletedWMATA developed operations administrative policies for rail supervisors.
CompletedWMATA developed automated rule check application for the hand held device.
CompletedWMATA revised supervisor training program and office of emergency management will provide feedback.
Not StartedWMATA will then finalize the training program and will conduct internal safety audit.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Dec 2016 O 9 5 progress=11&PercentComplete=56
FTA-Rail-2-20-a
WMATA must improve the quality and consistency of training for new Rail Supervisors to include purpose and requirements for rules checks
CompletedWMATA has developed a quarterly progress report.
CompletedWMATA developed operations administrative policies for rail supervisors.
CompletedWMATA developed automated rule check application for the hand held device.
CompletedWMATA revised supervisor training program and Office of Emergency Management will provide feedback.
Not StartedWMATA will then finalize the training program and will conduct internal safety audit.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
IV Dec 2016 O 9 5 progress=11&PercentComplete=56
FTA-Rail-2-21-a
WMATA must establish a minimum number of trips per month that each Rail Supervisor must complete on the mainline to ensure the sufficiency of his or her skills
CompletedWMATA assessed quarterly progress.
CompletedWMATA developed operations administrative policies for rail supervisors.
CompletedWMATA developed automated rule check application for the hand held device.
CompletedWMATA revised the supervisor training program and office of emergency management will provide feedback.
Not StartedWMATA will then finalize the training program and will conduct internal safety audit.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
IV Dec 2016 O 9 5 progress=11&PercentComplete=56
FTA-Rail-2-21-b
WMATA must review Supervisor Daily Activity Reports to ensure that Supervisors are completing required activities, including the minimum number of established trips per month
CompletedWMATA assessed quarterly progress.
CompletedWMATA developed operations administrative policies for rail supervisors.
CompletedWMATA developed automated rule check application for the hand held device.
CompletedWMATA revised the supervisor training program and Office of Emergency Management will provide feedback.
Not StartedWMATA will then finalize the training program and will conduct internal safety audit.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  IV   Dec 2016 O 10 5 progress=20&PercentComplete=50
FTA-Rail-2-22-a
WMATA must review its schedule of in service evaluations to ensure sufficient time is available for each Train Operator to receive his or her two-year re-certification
CompletedWMATA developed quarterly progress report and memo was developed explaining the steps taken to review the train operator re-certifications.
CompletedWMATA developed report for train operators scheduled and conducted certifications.
CompletedWMATA completed memo identifying measurable results and is developing out of compliance report. Standard operating procedure for train operator recertification was developed.
CompletedWMATA conducted an internal safety audit for compliance.
CompletedFinally, WMATA performed a quality audit to review deliverables.
  IV   May 2016 UR 9 9 progress=100&PercentComplete=100
FTA-Rail-2-22-b
WMATA's Information Technology Department must work Rail Operations Support to develop a long-term solution to tracking Train Operator re-certification status and the results of any other in service examinations or activities completed. Thereafter, WMATA will conduct quality audit for scope verification and inspection of deliverables.
CompletedWMATA identified requirements for employee training.
In ProgressWMATA developed immediate and short term solution procedures and is developing long term solution plan.
Not StartedWMATA will conduct IT quality audit report.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  III   Sep 2019 O 11 5 progress=36&PercentComplete=45
Category 3 - Insufficient Track Time for Maintenance   162 153 progress= 4&PercentComplete=94
FTA-Rail-3-23-a
WMATA must ensure that a process is in place for identifying and scheduling sufficient track time to complete required inspection, testing and maintenance activities
CompletedWMATA developed the department's structure and functionality guidelines for time allotment, inspection and testing.
CompletedWMATA assessed track access and revenue service adjustments.
CompletedWMATA developed RSA schedule on a weekly basis including performance measures and metrics, and is performing work zone audits to assess conflicts.
In ProgressWMATA will conduct quarterly briefings.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   May 2016 O 97 95 progress= 1&PercentComplete=98
FTA-Rail-3-24-a
WMATA must establish firm limits on minimum track time for inspection, testing and maintenance activities per month, and revisit limits annually
CompletedWMATA assessed time allotment for inspection and testing.
CompletedWMATA analyzed previous year allocations and used track time.
CompletedWMATA developed future year track time schedules and 12-week look-ahead schedules.
CompletedWMATA developed a procedural guidelines, performance measures and metrics.
In ProgressFinally, WMATA is performing a quality assurance audit to review actionable items.
  II   May 2016 O 10 8 progress=20&PercentComplete=80
FTA-Rail-3-25-a
WMATA must develop and implement staffing plans to eliminate maintenance work orders backlogs and manage on-going workload in track and structures, traction power, communications, and automated train control departments
In ProgressWMATA is assessing staffing plan to eliminate backlogs.
In ProgressWMATA is developing a procedural guidelines that includes backlogs.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  IV   Jul 2016 O 5 0 progress=80&PercentComplete= 0
FTA-Rail-3-26-a
WMATA must improve interdepartmental coordination and communication to take full advantage of track time
CompletedWMATA created a narrative of work zone coordination.
CompletedWMATA developed standard operating procedures.
CompletedWMATA completed the assessment of track access support services.
CompletedAssessment of 12-week look ahead schedule is completed.
CompletedFinally, WMATA performed a quality assurance audit to review actionable items.
  II   April 2016 UR 50 50 progress=0&PercentComplete=100
Category 4 - System-wide Maintenance Issues   35 15 progress=43&PercentComplete=43
FTA-Rail-4-27-a
For all major deps with insp and maint responsibilities for critical infra., WMATA must establish and/or update a preventive maint and insp testing quality audit process to ensure compliance with established maint and testing practices, and to monitor missed or incomplete preventive maint activities and/or inspection
In ProgressWMATA is developing standard operating procedures.
In ProgressWMATA is developing maintenance and inspection procedures and will update the audit plan.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Dec 2017 O 12 0 progress=83&PercentComplete= 0
FTA-Rail-4-28-a
WMATA must review the workload and inspection territory assigned to track inspectors, and leverage non-track inspectors to perform watchman duties
CompletedWMATA submitted track walker analysis to FTA.
CompletedWMATA submitted an analysis of track inspection practices to FTA.
CompletedWMATA submitted a guidelines explaining metro track inspection processes.
CompletedWMATA developed standard operating procedures.
CompletedRevised track walker report and track inspection report per FTA review was submitted for closure.
  II   Oct 2015 UR 4 4 progress=0&PercentComplete=100
FTA-Rail-4-29-a
WMATA must ensure that ROCC reports all signal alarms and notifications to ATC
CompletedWMATA developed standard operating procedures.
CompletedWMATA revised operations administrative procedures.
In ProgressWMATA completed the ATC alarm work order review and is establishing business procedures for periodic ATC alarm.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Jul 2016 O 4 2 progress=25&PercentComplete=50
FTA-Rail-4-30-a
WMATA must develop a plan to document roles and responsibilities, activities, and points of coordination regarding its program to measure, document and mitigate the impacts of stray negative return current
CompletedWMATA responded to FTA on current procedures.
CompletedWMATA studied stray negative return current and business process development.
In ProgressWMATA will the submit business process report, revised operations administrative procedures and corrective action plans to FTA.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Oct 2016 O 5 2 progress=40&PercentComplete=40
FTA-Rail-4-31-a
WMATA must assess adequacy of Automatic Train Control (ATC) staffing levels resulting from the addition of the Silver Line
CompletedWMATA assessed the staffing levels and is developing a report for reallocation of positions.
CompletedFinally, WMATA performed a quality assurance audit to review actionable items.
  II   Mar 2016 UR 3 3 progress=0&PercentComplete=100
FTA-Rail-4-32-a
WMATA must ensure that each department within Transit Infrastructure and Eng Services creates a formal program of Supervisory inspections to observe maint, look at quality of work in the field, and formally intervene to evaluate, re-train (if necessary), and enhance the professional development of employees.
In ProgressWMATA is developing a training program for supervisor QC management of maintenance activity.
In ProgressWMATA is reviewing current WMATA policies and procedures and will create new policies to include supervisory inspection.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Jul 2016 O 3 0 progress=67&PercentComplete= 0
FTA-Rail-4-33-a
Each WMATA Department impacted by inventory stockouts must develop a recovery or corrective action plan to ensure equipment availability and to manage delays.
CompletedWMATA developed notification process to alert potential stock-out.
CompletedWMATA documented procedures to manage delays in procuring materials and systematically reviewing inventory.
CompletedFinally, WMATA has performed a quality assurance audit to review actionable items.
  II   Nov 2015 AI 4 4 progress=0&PercentComplete=100
Category 5 - Fire/Life Safety and Emergency Preparedness   37 22 progress=32&PercentComplete=51
FTA-Rail-5-34-a
WMATA must complete its "Fire/Life Safety 1000" maintenance procedure, to clarify roles and responsibilities, and outline expectations regarding how departments should work together to coordinate inspection, maintenance and repair of these system components
CompletedWMATA developed guidelines and diagrams of tunnel fan, under platform and dome fans.
CompletedWMATA developed fire/life safety 1000 procedures.
CompletedWMATA rolled out plan for implementation and performed audit and testing of procedures.
CompletedWMATA conducted quality audit for scope verification and inspection of actionable items.
  II   May 2016 UR 8 8 progress=0&PercentComplete=100
FTA-Rail-5-35-a
WMATA must establish clear definitions for infrastructure conditions requiring immediate or emergency action, such as "arcing insulator."
CompletedWMATA developed a comprehensive list of issues that require emergency action.
CompletedWMATA developed a narrative memo defining conditions that require immediate action.
In ProgressWMATA is conducting quarterly assesssment of employee reporting and management of conditions that require immediate action.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  IV   Jul 2016 O 5 3 progress=20&PercentComplete=60
FTA-Rail-5-35-b
WMATA must address third rail insulator cleaning and replacement requirements and third rail jumper cable inspection and replacement requirements as part of the "FLS 1000" procedure, or in separate but referenced procedures
CompletedWMATA developed guidelines to review upcoming track work requests.
CompletedWMATA revised procedures that support the ongoing compliance reviews.
In ProgressWMATA is developing a report of the TRST 2000 and power 100 plans.
In ProgressWMATA is developing a management directive that details the plan for insulator cleaning.
In ProgressQuarterly assessment of insulator cable replacement are in progress.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  IV   Dec 2016 O 9 4 progress=22&PercentComplete=44
FTA-Rail-5-35-c
WMATA must improve its ability to detect the location of smoke in its tunnel network
CompletedWMATA developed solutions for smoke detection.
CompletedWMATA submitted standard operating procedures on the reporting of smoke locations.
CompletedFinally, WMATA has performed a quality assurance audit to review actionable items.
Note: WMATA will address FTA comments.
  II   Jan 2016 AC 5 5 progress=60&PercentComplete=40
FTA-Rail-5-35-d
WMATA must resume its program for cable insulation resistance testing for its power cables. Insulation resistance testing should be performed on power cables every 10 years
CompletedWMATA submitted the status of the insulator resistance testing.
In ProgressWMATA is developing a detailed power 1000 plan.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Jan 2017 O 4 1 progress=50&PercentComplete=25
FTA-Rail-5-35-e
WMATA must replace all defective power cables that have been identified by traction power inspectors and maintainers
In ProgressWMATA is conducting quarterly assessment on replacement of defective insulators cables.
In ProgressFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Jan 2017 O 2 0 progress=50&PercentComplete= 0
FTA-Rail-5-35-f
WMATA must set a schedule of drills to assess the effectiveness of WMATA's response to smoke in tunnel and station conditions
CompletedWMATA developed three year plan for emergency training exercises.
In ProgressWMATA is developing after action plans and a tracker to identify corrective actions and the status of recommended changes.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Dec 2016 O 4 1 progress=50&PercentComplete=25
Category 6 - Condition and Performance of Tunnel Ventilation System   21 10 progress=33&PercentComplete=48
FTA-Rail-6-36-a
WMATA must establish a ventilation system testing quality audit process to ensure compliance with established maintenance and testing practices
CompletedWMATA developed an under platform exhaust, tunnel fan and dome fan process diagram.
CompletedWMATA developed fire/life safety 1000 procedures.
CompletedFinally, WMATA performed a quality assurance audit to review actionable items.
  II   May 2016 UR 6 6 progress=0&PercentComplete=100
FTA-Rail-6-36-b
WMATA must automate inspection and maintenance record keeping for tunnel ventilation systems, drainage pumping stations, and other critical systems managed by the Office of Plant Maintenance
CompletedWMATA developed inspection, testing and PM procedures.
CompletedWMATA submitted a project work plan that provide scope and approach.
In ProgressWMATA is procuring hand held devices and will train personnel to use mobile devices and document attendance.
In ProgressWMATA is developing a maintenance inspection report.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Jul 2017 O 6 2 progress=67&PercentComplete=33
FTA-Rail-6-37-a
WMATA must complete replacement of the pneumatic control boxes for ventilation fans with Programmable Logic Control (PLC) systems within the next five years
CompletedWMATA developed drawings and specifications to procure PLC tunnel systems.
CompletedWMATA verified existing PLC controls and is in the process of procuring contract for PLC fan controls panel.
In ProgressWMATA is developing project work plan for installation of control panels. After procuring the contract, WMATA will receipt first set of control panels.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Oct 2016 O 6 2 progress=33&PercentComplete=33
FTA-Rail-6-38-a
WMATA must conduct an engineering assessment to identify ways in which to improve the performance and capacity of the tunnel ventilation system
In ProgressWMATA is analyzing ventilation improvements.
In ProgressWMATA will develop an action plan from the ventilation improvements analysis.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Oct 2016 O 3 0 progress=33&PercentComplete= 0
Category 7 - Performance of Information Management Technology   38 13 progress=18&PercentComplete=34
FTA-Rail-7-39-a
WMATA must evaluate the existing ELM recordkeeping system and take corrective action, as necessary, to ensure accurate training, re-certification, and professional certification records are created, maintained, and readily accessible to appropriate managers and employees
In ProgressWMATA is developing ELM policy and evaluating ELM's alternatives.
Not StartedWMATA will implemeny new learning management system and develop user training materials and schedule.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  IV   Sept 2019 O 11 0 progress=27&PercentComplete= 0
FTA-Rail-7-40-a ,b, and c & FTA-Rail-7-41-a
WMATA must develop a training strategy for improving the capabilities of employees to enter, analyze & assess information into the agency's Maint Mgmt Info Sys, WMATA must establish a data reliability working group focused on maint info, The IT Dept must coordinate with the Technical Training Dept
CompletedWMATA developed a project management and reengineering plan.
In ProgressWMATA developed business and is developing technical requirements and system design documents.
Not StartedWMATA will conduct a user acceptance test and will develop a training schedule.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  IV   Aug 2017 O 9 3 progress=22&PercentComplete=33
FTA-Rail-7-41-b
The Information Technology Department must coordinate with Rail Operations Quality Training to ensure the availability of additional training for the Rail Operations Control Center staff on the Advanced Information Management system
CompletedWMATA developed a detailed project management and business requirement plan.
CompletedWMATA developed training materials and conducted IT trainings.
CompletedWMATA delivered training to ROCC personnel.
In ProgressFinally, WMATA is performing a quality assurance audit to review actionable items.
  IV   Jul 2016 O 6 5 progress=17&PercentComplete=83
FTA-Rail-7-42-a
WMATA operating and maintenance depart must work together to develop a strategy to more actively analyze, review, and assess rail operation and maintenance data from a safety perspective.
CompletedWMATA developed a detailed project management plan.
In ProgressWMATA is developing techincal requirements.
Not StartedWMATA will conduct user acceptance testing and provide training to end users.
Not StartedWMATA will assess lessons learned report and will roll out plan that explains how the pilot can be implemented.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Mar 2018 O 8 1 progress=13&PercentComplete=13
FTA-Rail-7-42-b
WMATA must work with the Tri-State Oversight Committee and FTA to establish and pilot an enhanced investigation process for rail transit accidents, incidents and safety studies that identify systemic root causes and deficiencies
CompletedWMATA provided initial hazard rating for all open accidents/incidents.
CompletedWMATA revised the policy/instruction and developed top ten list of highest priority accident/incident investigations.
CompletedFinally, WMATA performed a quality assurance audit to review actionable items.
  III   Jan 2016 UR 4 4 progress=0&PercentComplete=100
Category 8 - Outstanding Items from Previous FTA Audits and Reviews   20 16 progress=10&PercentComplete=80
FTA-Rail-8-43-a
WMATA must assess the resources assigned to the Automatic Train Control Department to ensure their sufficiency to carry out critical work, including completion of the program for replacement of the Alstom Gen II track circuits by 2017
CompletedWMATA submitted status review of track circuit replacement.
CompletedWMATA submitted scope of work and schedule for replacement.
CompletedWMATA committed funding for completion and staffing assessment.
CompletedWMATA submitted quarterly progress of track circuit replacement.
CompletedFinally, WMATA performed a quality assurance audit to review actionable items.
  II   Nov 2015 C 7 7 progress=0&PercentComplete=100
FTA-Rail-8-43-b
WMATA must expedite actions to address Corrective Action Plans from 2009 Fort Totten collision, including the 38 open items from the System Implementation Gap Analysis Report (SIGAR)
CompletedWMATA developed an overview of committee meetings.
In ProgressWMATA is developing closure documentation for committee approval.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Jan 2017 O 3 1 progress=33&PercentComplete=33
FTA-Rail-8-43-c
WMATA must replace ATC cables with low insulation resistance readings
CompletedWMATA explained steps taken to review ATC cable insulation resistance testing and replacement program.
CompletedWMATA developed a low insulation resistance vital ATC cable report and ATC cable replacement schedule.
In ProgressWMATA is developing an ATC cable replacement progress report.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Sep 2016 O 5 3 progress=20&PercentComplete=60
FTA-Rail-8-44-a &
FTA-Rail-8-44-b
WMATA must complete required submittals to FTA to close-out 2012 Safety and Maint Audit Recom #2 relating to the WMATA's rail de-stressing program& FTA-Rail-8-44-b - WMATA must conduct an independent assess regarding the Critical Rail Neutral Temp and Preferred Rail Laying Temp
CompletedWMATA gathered all historical data, including safety and maintenance audit.
CompletedWMATA updated heat counter measures and is developing action plans based on studies.
CompletedFinally, WMATA performed a quality assurance audit to review actionable items.
Note: Work is ongoing, with an estimated CAP closure request date of April 2016
  III   Feb 2016 O/PD 5 5 progress=0&PercentComplete=100
Metrobus   96 50 progress=17&PercentComplete=49
Category 1 - Concern over the Protection of Metrobus Operations Personnel   10 7 progress=10&PercentComplete=70
FTA-Bus-1-1-a
WMATA will expedite development of an agency-wide coordinated strategy to address contributing elements to Bus Operator Assaults including: training, deployment of police and security resources, enhanced community outreach, and resolving fare box performance and reliability issues.
In ProgressWMATA provided guide with step-by-step trouble shooting instructions for Farebox issues.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Jul 2016 O 6 3 progress=17&PercentComplete=50
FTA-Bus-1-1-b
WMATA's Safety Department must increase its level of involvement in the Operator Assault Preventative/Awareness Safety Initiative at Local Safety Committees (LSC), and in the development of the overall strategy for enhanced protection of Bus Operators.
CompletedWMATA shared assault data with LSC, DSC, and ESC.
CompletedAll new buses will now include a barrier to separates the operator from the public.
CompletedWMATA has coordinated with MTPD to focus on High Intensity Target areas.
CompletedFinally, WMATA performed a quality assurance audit to review actionable items.
  II   Jan 2016 C 4 4 progress=0&PercentComplete=100
Category 2 - Limited Availability of Training for Operations and Maintenance Personnel   42 6 progress=19&PercentComplete=14
FTA-Bus-2-2-a
WMATA must develop a strategy and approach for developing, offering and updating refresher training as required in current policies and standards, for key categories of Transportation and Maintenance personnel, including Bus Operators, Street Supervisors, BOCC Specialists, and Bus Maintenance personnel.
CompletedAll personnel have undergone safety refresher training and the status of the 5-year recertification program has been assessed for implementation.
In ProgressRefresher training is being developed in accordance with the BOCC manual in order to ensure its continuation.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Sept 2017 O 35 6 progress= 6&PercentComplete=17
FTA-Bus-2-3-a
WMATA must develop a BOCC Manual (with processes and procedures) & a complete set of checklists for simple Standard Operating Procedures & bus vehicle troubleshooting guidance. A clear accompanying process should be established for updating the Manual & training specialists on its contents & updates.
In ProgressWMATA is developing a BOCC manual and standards, and will conduct the training of these new processes and procedures.
In ProgressWMATA will develop monthly progress status on training compliance.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  IV   Jan 2017 O 7 0 progress=21&PercentComplete= 0
Category 3 - Inconsistent Operational Testing and Rules Compliance Checks   20 15 progress=15&PercentComplete=75
FTA-Bus-3-4-a
WMATA must assess its overall approach to the performance of pre-trip inspections to determine the adequacy of time available for Operators to perform these inspections, the level of training available to Operators, and whether additional condition cards should be developed for different sub-fleets.
CompletedWMATA replaced recording and delivery system with electronic system.
In ProgressWMATA will train employees on system.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  II   Jul 2016 O 9 4 progress=33&PercentComplete=44
FTA-Bus-3-5-a
WMATA must establish and enforce a formal program to ensure that Supervisors assess Bus Operator performance.
CompletedWMATA developed and implemented a process to conduct evaluations on an annual basis.
CompletedWMATA implemented evaluation process to track employee assessments.
CompletedWMATA performed a quality assurance audit to review actionable items.
Note: WMATA will address FTA comments.
  IV   Feb 2016 AC 5 5 progress=60&PercentComplete=40
FTA-Bus-3-5-b
WMATA must expand the total number and frequency of Passenger Service / Operator Skills Audits performed by Corporate Quality Assurance.
CompletedWMATA developed a PSA assessment schedule annually.
CompletedTrend analysis audits were conducted to track risky behavior and unsafe work practices.
CompletedFinally, WMATA performed a quality assurance audit to review actionable items.
  IV   Apr 2016 UR 4 4 progress=0&PercentComplete=100
FTA-Bus-3-6-a
WMATA must establish a strategy and timeframe for extending the Fatigue Risk Management Program to all Bus Operations Control Center staff, including BOCC Specialists, the Street Operations Managers (SOMs), Street Supervisors and Division Office Managers.
CompletedWMATA updated fatigue risk management policy.
CompletedWMATA performed a quality assurance audit to review actionable items.
  II   Dec 2015 C 2 2 progress=0&PercentComplete=100
Category 4 - System-wide Maintenance Issues   14 14 progress= 0&PercentComplete=100
FTA-Bus-4-7-a
WMATA must develop and implement a plan to bring its bus maintenance materials procurement process into compliance with FTA Circular 4220.1F. This plan must include a formal testing process for newly procured parts and enhancements to the process currently used to accept new bus vehicles.
CompletedWMATA hired two new quality control inspectors to ensure that the new policy is implemented.
CompletedFinally, WMATA performed a quality assurance audit to review actionable items.
  III   Apr 2016 UR 7 7 progress= 0&PercentComplete=100
FTA-Bus-4-8-a
WMATA must conduct a resource evaluation regarding overall staffing and resources available to Quality Assurance & to other quality divisions and departments within Bus Maintenance & operational support in-plant inspection and general maintenance materials procedure. Options to re-instate factory visits must also be considered as part of this assessment.
CompletedWMATA issued a first article inspection, certifiable items list, and safety inspection report.
CompletedFinally, WMATA performed a quality assurance audit to review actionable items.
  IV   April 2016 UR 7 7 progress= 0&PercentComplete=100
Category 5 - Lack of Information Management System Technology   9 7 progress=11&PercentComplete=78
FTA-Bus-5-9-a
Conduct an assessment determining the adequacy of resources available to support Bus Operations Control Center and Bus Superintendents with data entry and analysis.
CompletedWMATA analyzed of operational and safety concerns, and developed training manual.
In ProgressThese policy changes will establish the roles and responsibilities of the staffing requirements for BOCC specialists going forward.
Not StartedFinally, WMATA will perform a quality assurance audit to review actionable items.
  III   Jan 2017 O 4 2 progress=25&PercentComplete=50
FTA-Bus-5-10-a
WMATA must formalize the procedure for how a Local Safety Committee will elevate a safety concern to the Departmental Safety Committee.
CompletedWMATA has updated Policy Instruction 10.2/2 related to new safety concerns since the last update.
Completed Finally, WMATA performed a quality audit to review actionable items.
  II   Mar 2016 C 2 2 progress=0&PercentComplete=100
FTA-Bus-5-10-b
WMATA must define the Bus Safety Officer roles and responsibilities and conduct an assessment determining the adequacy of resources available for Bus Safety Officers to complete these responsibilities.
CompletedWMATA completed the SAFE handbook with roles and responsibilities.
CompletedWMATA assessed the adequacy of safety officers.
CompletedFinally, WMATA performed a quality audit to review actionable items.
  II   Mar 2016 UR 3 3 progress=0&PercentComplete=100