Status and Alerts

Current Alerts

MORE DETAILS
Route/Line Issue Impact Last Updated

Planned Changes

Events & Announcements

MORE OPTIONS

Service Changes & Station Construction

Route/Line What's Happening Issue Start Date End Date
station icon
L'Enfant Plaza

Escalator Closed In May 2024, Metro continued a major capital project replacing entrance escalators: three at Entrance B (6th St) from late May 2024 to June 2025 and three at Entrance C (9th St) from June 2025 to August 2026.

Show Details
05/17/2024 08/31/2026
station icon
Silver Spring

Rail Station Construction MDOT MTA Purple Line construction crews continue to work on a new mezzanine that will connect the future station to Metro, MARC, and the transit center. Expect construction through 2026.

Show Details
04/13/2023 12/31/2026
station icon
Judiciary Square

Entrance/Exit Inhibited In January 2023, Metro began a capital project to install a new staircase and canopy at Judiciary Square’s north entrance. The stairway is scheduled to open in spring 2026 and canopy construction will begin spring 2026.

Show Details
01/01/2023 12/31/2026
station icon
Arlington Cemetery

Rail Station Construction In June 2023, Metro began a major capital project to install two canopies above the station escalators.

Show Details
06/01/2023 03/31/2026
station icon
Rosslyn

Escalator Closed In January 2024, Metro began a major capital project replacing the four entrance escalators and four platform escalators at Rosslyn Station –all eight escalators are expected to be completed by June 2026.

Show Details
01/02/2024 06/30/2026
station icon
Southern Avenue

Parking Changes In June 2024, Metro began reconfiguring the Kiss & Ride Lot and reopened the lower level of the Park & Ride Lot. Up to 85% of parking spaces in the Kiss & Ride Lot will close indefinitely; but daily parking is available in the Park & Ride (rates apply).

Show Details
06/24/2024 12/31/2026
bus icon
C81

Temporary Detour Temporary Detour: Construction on Kennedy Street NW on June 30

Show Details
06/30/2025 07/06/2026
station icon
East Falls Church

Rail Station Construction,Parking Changes On July 21, 2025, Arlington County/Metro began reconstruction of the Bus Loop. The work will be divided into phases and will take approximately 15 months to complete. Parking facility capacity may be impacted during various phases of the work.

Show Details
07/21/2025 10/21/2026
station icon
Bethesda

Rail Station Construction Metro is building a new mezzanine at the south end of the station, to connect Metro to the future Purple Line Bethesda Station. The mezzanine will not be available until Purple Line opens in 2027.

Show Details
07/28/2025 06/28/2027
station icon
West Hyattsville

Escalator Closed On August 17, 2025, Metro began modernizing the escalators at the West Hyattsville Station. The work will take approximately ten months to complete, and one escalator will be out of service at a time.

Show Details
08/17/2025 06/28/2026
bus icon
C15

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C37

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C41

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C51

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C11

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P93

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P94

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P97

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
C11

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P97

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
D74

Temporary Detour Temporary Detour: DDOT Construction Project on Connecticut Ave Underpass Lanes

Show Details
09/23/2025 09/23/2026
bus icon
D96

Temporary Detour Temporary Detour: DDOT Construction Project on Connecticut Ave Underpass Lanes

Show Details
09/23/2025 09/23/2026
station icon
Glenmont

Elevator Closed On September 15, 2025, Metro began rehabilitating one of three elevators in the East Parking Garage. One elevator will be out of service at a time, with the remaining two elevators operational.

Show Details
09/15/2025 07/14/2026
station icon
Navy Yard-Ballpark

Escalator Closed On September 28, 2025, Metro began a major capital project replacing the three entrance escalators and two platform escalators at the west entrance (at the corner of M and Half Streets, SE). The project is expected to be complete by Spring 2026.

Show Details
09/28/2025 02/27/2026
bus icon
P40

Stop Relocation Permanent Bus Stop Relocation: Annapolis Rd at Gallatin St on October 10

Show Details
10/10/2025 10/09/2026
bus icon
C51

Stop Relocation Temporary Bus Stop Closure: 18th St NW at California St on October 10

Show Details
10/10/2025 03/09/2026
bus icon
C53

Stop Relocation Temporary Bus Stop Closure: 18th St NW at California St on October 10

Show Details
10/10/2025 03/09/2026
station icon
West Falls Church

Other (chillers and lighting) In November 2025, Metro began construction at West Falls Church as part of a joint development project. As part of this work, the north parking lot will be closed for the duration of the project; customers should instead utilize the onsite parking garage.

Show Details
10/14/2025 08/01/2027
station icon
U Street/African-Amer Civil War Memorial/Cardozo

Escalator Closed On November 17, 2025, Metro will begin Phase 4 to install the canopy above the station escalators at U Street/African American Civil War Memorial/Cardozo Station.

Show Details
11/17/2025 09/30/2026
bus icon
C41

Temporary Bus Stop Temporary Bus Stop Closure: Construction on 14th St NE

Show Details
10/27/2025 04/22/2026
station icon
New Carrollton

Elevator Closed On November 17, 2025, Metro began rehabilitating the elevator servicing the mezzanine and street-level at New Carrollton Station on the Ellin Road side. The elevator will be out of service during that time.

Show Details
11/17/2025 02/28/2026
station icon
Twinbrook

Parking Changes Beginning December 15, Metro will begin Phase 2 of the Bus Shelter Installation Project at Twinbrook Metro Station, replacing seven (7) existing bus shelters. The Twinbrook East Bus Loop will remain closed through February 2025 until installation is completed. Bus service will continue to operate from the temporarily relocated stops on Chapman Ave. Bus service will continue to operate from the current temporarily relocated stops on Chapman Ave.

Show Details
12/15/2025 03/01/2026
station icon
Crystal City

Rail Station Construction,Rail Station Closed: No Trains Passing Through Beginning Feb. 14, 2026, Crystal City station will be closed over ten separate weekends until June 2026 as part of the Crystal City second entrance construction project. During impacted weekends, Metro will provide riders with free shuttle buses at impacted stations.

Show Details
12/29/2025 06/30/2026
station icon
Ronald Reagan Washington National Airport

Rail Station Construction,Rail Station Closed: No Trains Passing Through On March 7-8, May 9-10, and May 16-17, 2026, Ronald Reagan Washington National Airport station will be closed as part of the Crystal City second entrance construction project. During impacted weekends, Metro will provide riders with free shuttle buses at impacted stations.

Show Details
12/29/2025 06/30/2026
station icon
Mt Vernon Sq 7th St-Convention Center

Elevator Closed On February 3, 2026, Metro began rehabilitating the back elevator servicing the Platform and Mezzanine levels at Mt Vernon Square Station. The work will take approximately two months to complete, and the elevator will be out of service during that time.

Show Details
02/03/2026 04/14/2026
bus icon
D40

Temporary Bus Stop Temporary Bus Stop Closure: 7th St NW at F St on January 12

Show Details
01/12/2026 01/14/2028
bus icon
A12

Temporary Bus Stop Temporary Bus Stop Changes: S Walter Reed Dr at 9th St on January 12

Show Details
01/12/2026 04/01/2026
bus icon
F28

Service Change Service Change: F28 Additional Trip

Show Details
01/13/2026 03/14/2026
bus icon
D44

Temporary Bus Stop Temporary Bus Stop Closure: Florida Ave NW at W St on February 2

Show Details
02/02/2026 04/02/2026
bus icon
D70

Temporary Bus Stop Temporary Bus Stop Closure: Connecticut Ave NW at R St

Show Details
01/28/2026 04/15/2026
bus icon
D72

Temporary Bus Stop Temporary Bus Stop Closure: Connecticut Ave NW at R St

Show Details
01/28/2026 04/15/2026
bus icon
D70

Temporary Bus Stop Temporary Bus Stop Closure: Connecticut Ave NW at Wyoming Ave

Show Details
01/28/2026 04/15/2026
station icon
Foggy Bottom-GWU

Escalator Closed In January 2026, Metro began replacing one platform escalator and one entrance escalator with new models that are more durable and reliable. All station entrances, the elevator, stairs, and adjacent escalators will remain open. The project is expected to be completed by June, 2026.

Show Details
01/19/2026 06/22/2026
bus icon
C81

Stop Change Bus Stop Reinstallation: 14th St NW at Colorado Ave on January 20

Show Details
01/20/2026 03/20/2026
bus icon
D50

Stop Change Bus Stop Reinstallation: 14th St NW at Colorado Ave on January 20

Show Details
01/20/2026 03/20/2026
bus icon
D5X

Stop Change Bus Stop Reinstallation: 14th St NW at Colorado Ave on January 20

Show Details
01/20/2026 03/20/2026
bus icon
M44

Stop Relocation Permanent Bus Stop Relocation on East West Highway and 43rd Street on January 26

Show Details
01/26/2026 04/26/2026
bus icon
P10

Stop Relocation Permanent Bus Stop Relocation on East West Highway and 43rd Street on January 26

Show Details
01/26/2026 04/26/2026
bus icon
C83

Temporary Detour Temporary Detour: Construction on Oregon Ave NW at Nebraska Ave

Show Details
02/04/2026 06/11/2026
station icon
Tenleytown-AU

Escalator Closed On May 4, 2026, Metro will begin Phase 4 to install the canopy above the station escalators at the Tenleytown – AU East Station Entrance.

Show Details
05/04/2026 09/30/2026
bus icon
C37

Temporary Bus Stop Temporary Bus Stop Closure: 50th St NE and Banks Pl on February 19

Show Details
02/19/2026 02/26/2026
station icon
Gallery Pl-Chinatown

Escalator Closed On June 9, 2025, Metro began a major capital project replacing four entrance escalators at Entrance A (7th and F Street, NW), while two escalators are being replaced, the remaining two escalators will remain operational. The project is expected to be completed by April 2026.

Show Details
11/17/2025 04/27/2026
station icon
Grosvenor-Strathmore

Parking Changes On August 4, 2025, Metro began construction on the Grosvenor-Strathmore Joint Development project. The project will transform underutilized land into a vibrant, mixed-use development by building “The Reserve,” a senior living facility that will add to the community fabric of Strathmore Square.

Show Details
08/04/2025 01/01/2028
station icon
Shady Grove

Parking Changes Beginning February 16th, Bus shelters C and D at Shady Grove-East bus loop will temporarily close and relocate to temporary stops T1 (Bus Shelter C) and T2 (Bus Shelter D.) The Kiss & Ride will also be closed during this period. For more information, visit wmata.com/busshelters.

Show Details
02/16/2026 03/02/2026
bus icon
A49

Temporary Detour Temporary Detour: Construction on The Theodore Roosevelt Bridge

Show Details
02/16/2026 07/31/2026
station icon
Shady Grove

General Announcement Beginning February 23, Bus shelters J and K at Shady Grove-West bus loop will temporarily close and relocate to temporary stops T1 (Bus Shelter J) and T2 (Bus Shelter K.) Beginning on March 9, Bus Shelters L and M at Shady Grove-West bus loop will temporarily close and relocation to temporary stops T1 (Bus Shelter L) and T2 (Bus Shelter M.)

Show Details
02/20/2026 04/06/2026
station icon
Twinbrook

General Announcement On March 2nd, Metro will reopen the Twinbrook-East Bus Loop that was previously closed for repairs, for service. Bus routes providing temporary service at temporary stops G, H, J located on Chapman Ave will relocate to resume service at the east loop. Kiss & Ride on east bus loop will reopen. Read advisory for bus route details.

Show Details
03/02/2026 03/15/2026
bus icon
D50

Temporary Detour Temporary Detour: Construction on 14th St February 28

Show Details
02/28/2026 02/28/2026
bus icon
D5X

Temporary Detour Temporary Detour: Construction on 14th St February 28

Show Details
02/28/2026 02/28/2026
bus icon
M12

Stop Relocation Twinbrook Bus Loop Project Completion

Show Details
03/02/2026 04/02/2026
bus icon
D5X

Temporary Detour Temporary Detour: Construction on 14th St NW and Underwood St

Show Details
03/02/2026 03/13/2026
bus icon
D1X

Temporary Detour Temporary Detour: Construction on Constitution Ave NW February 28

Show Details
02/28/2026 02/28/2026
bus icon
D40

Temporary Detour Temporary Detour: Construction on Constitution Ave NW February 28

Show Details
02/28/2026 02/28/2026
bus icon
D4X

Temporary Detour Temporary Detour: Construction on Constitution Ave NW February 28

Show Details
02/28/2026 02/28/2026
bus icon
D60

Temporary Detour Temporary Detour: Construction on Constitution Ave NW February 28

Show Details
02/28/2026 02/28/2026
bus icon
A58

Temporary Detour Temporary Detour: Construction on the Central Place Tower Tunnel in Rosslyn

Show Details
03/01/2026 04/26/2026
bus icon
D30

Temporary Bus Stop Temporary Bus Stop Closure: 12th St NE and Monroe St on February 26

Show Details
02/26/2026 03/26/2026
Route/Line What's Happening Issue Start Date End Date
station icon
L'Enfant Plaza

Escalator Closed In May 2024, Metro continued a major capital project replacing entrance escalators: three at Entrance B (6th St) from late May 2024 to June 2025 and three at Entrance C (9th St) from June 2025 to August 2026.

Show Details
05/17/2024 08/31/2026
station icon
Silver Spring

Rail Station Construction MDOT MTA Purple Line construction crews continue to work on a new mezzanine that will connect the future station to Metro, MARC, and the transit center. Expect construction through 2026.

Show Details
04/13/2023 12/31/2026
station icon
Judiciary Square

Entrance/Exit Inhibited In January 2023, Metro began a capital project to install a new staircase and canopy at Judiciary Square’s north entrance. The stairway is scheduled to open in spring 2026 and canopy construction will begin spring 2026.

Show Details
01/01/2023 12/31/2026
station icon
Arlington Cemetery

Rail Station Construction In June 2023, Metro began a major capital project to install two canopies above the station escalators.

Show Details
06/01/2023 03/31/2026
station icon
Rosslyn

Escalator Closed In January 2024, Metro began a major capital project replacing the four entrance escalators and four platform escalators at Rosslyn Station –all eight escalators are expected to be completed by June 2026.

Show Details
01/02/2024 06/30/2026
station icon
Southern Avenue

Parking Changes In June 2024, Metro began reconfiguring the Kiss & Ride Lot and reopened the lower level of the Park & Ride Lot. Up to 85% of parking spaces in the Kiss & Ride Lot will close indefinitely; but daily parking is available in the Park & Ride (rates apply).

Show Details
06/24/2024 12/31/2026
bus icon
C81

Temporary Detour Temporary Detour: Construction on Kennedy Street NW on June 30

Show Details
06/30/2025 07/06/2026
station icon
East Falls Church

Rail Station Construction,Parking Changes On July 21, 2025, Arlington County/Metro began reconstruction of the Bus Loop. The work will be divided into phases and will take approximately 15 months to complete. Parking facility capacity may be impacted during various phases of the work.

Show Details
07/21/2025 10/21/2026
station icon
Bethesda

Rail Station Construction Metro is building a new mezzanine at the south end of the station, to connect Metro to the future Purple Line Bethesda Station. The mezzanine will not be available until Purple Line opens in 2027.

Show Details
07/28/2025 06/28/2027
station icon
West Hyattsville

Escalator Closed On August 17, 2025, Metro began modernizing the escalators at the West Hyattsville Station. The work will take approximately ten months to complete, and one escalator will be out of service at a time.

Show Details
08/17/2025 06/28/2026
bus icon
C15

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C37

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C41

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C51

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C11

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P93

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P94

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P97

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
C11

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P97

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
D74

Temporary Detour Temporary Detour: DDOT Construction Project on Connecticut Ave Underpass Lanes

Show Details
09/23/2025 09/23/2026
bus icon
D96

Temporary Detour Temporary Detour: DDOT Construction Project on Connecticut Ave Underpass Lanes

Show Details
09/23/2025 09/23/2026
station icon
Glenmont

Elevator Closed On September 15, 2025, Metro began rehabilitating one of three elevators in the East Parking Garage. One elevator will be out of service at a time, with the remaining two elevators operational.

Show Details
09/15/2025 07/14/2026
bus icon
P40

Stop Relocation Permanent Bus Stop Relocation: Annapolis Rd at Gallatin St on October 10

Show Details
10/10/2025 10/09/2026
bus icon
C51

Stop Relocation Temporary Bus Stop Closure: 18th St NW at California St on October 10

Show Details
10/10/2025 03/09/2026
bus icon
C53

Stop Relocation Temporary Bus Stop Closure: 18th St NW at California St on October 10

Show Details
10/10/2025 03/09/2026
station icon
West Falls Church

Other (chillers and lighting) In November 2025, Metro began construction at West Falls Church as part of a joint development project. As part of this work, the north parking lot will be closed for the duration of the project; customers should instead utilize the onsite parking garage.

Show Details
10/14/2025 08/01/2027
station icon
U Street/African-Amer Civil War Memorial/Cardozo

Escalator Closed On November 17, 2025, Metro will begin Phase 4 to install the canopy above the station escalators at U Street/African American Civil War Memorial/Cardozo Station.

Show Details
11/17/2025 09/30/2026
bus icon
C41

Temporary Bus Stop Temporary Bus Stop Closure: Construction on 14th St NE

Show Details
10/27/2025 04/22/2026
station icon
New Carrollton

Elevator Closed On November 17, 2025, Metro began rehabilitating the elevator servicing the mezzanine and street-level at New Carrollton Station on the Ellin Road side. The elevator will be out of service during that time.

Show Details
11/17/2025 02/28/2026
station icon
Twinbrook

Parking Changes Beginning December 15, Metro will begin Phase 2 of the Bus Shelter Installation Project at Twinbrook Metro Station, replacing seven (7) existing bus shelters. The Twinbrook East Bus Loop will remain closed through February 2025 until installation is completed. Bus service will continue to operate from the temporarily relocated stops on Chapman Ave. Bus service will continue to operate from the current temporarily relocated stops on Chapman Ave.

Show Details
12/15/2025 03/01/2026
station icon
Crystal City

Rail Station Construction,Rail Station Closed: No Trains Passing Through Beginning Feb. 14, 2026, Crystal City station will be closed over ten separate weekends until June 2026 as part of the Crystal City second entrance construction project. During impacted weekends, Metro will provide riders with free shuttle buses at impacted stations.

Show Details
12/29/2025 06/30/2026
station icon
Ronald Reagan Washington National Airport

Rail Station Construction,Rail Station Closed: No Trains Passing Through On March 7-8, May 9-10, and May 16-17, 2026, Ronald Reagan Washington National Airport station will be closed as part of the Crystal City second entrance construction project. During impacted weekends, Metro will provide riders with free shuttle buses at impacted stations.

Show Details
12/29/2025 06/30/2026
station icon
Mt Vernon Sq 7th St-Convention Center

Elevator Closed On February 3, 2026, Metro began rehabilitating the back elevator servicing the Platform and Mezzanine levels at Mt Vernon Square Station. The work will take approximately two months to complete, and the elevator will be out of service during that time.

Show Details
02/03/2026 04/14/2026
bus icon
D40

Temporary Bus Stop Temporary Bus Stop Closure: 7th St NW at F St on January 12

Show Details
01/12/2026 01/14/2028
bus icon
A12

Temporary Bus Stop Temporary Bus Stop Changes: S Walter Reed Dr at 9th St on January 12

Show Details
01/12/2026 04/01/2026
bus icon
F28

Service Change Service Change: F28 Additional Trip

Show Details
01/13/2026 03/14/2026
bus icon
D44

Temporary Bus Stop Temporary Bus Stop Closure: Florida Ave NW at W St on February 2

Show Details
02/02/2026 04/02/2026
bus icon
D70

Temporary Bus Stop Temporary Bus Stop Closure: Connecticut Ave NW at R St

Show Details
01/28/2026 04/15/2026
bus icon
D72

Temporary Bus Stop Temporary Bus Stop Closure: Connecticut Ave NW at R St

Show Details
01/28/2026 04/15/2026
bus icon
D70

Temporary Bus Stop Temporary Bus Stop Closure: Connecticut Ave NW at Wyoming Ave

Show Details
01/28/2026 04/15/2026
station icon
Foggy Bottom-GWU

Escalator Closed In January 2026, Metro began replacing one platform escalator and one entrance escalator with new models that are more durable and reliable. All station entrances, the elevator, stairs, and adjacent escalators will remain open. The project is expected to be completed by June, 2026.

Show Details
01/19/2026 06/22/2026
bus icon
C81

Stop Change Bus Stop Reinstallation: 14th St NW at Colorado Ave on January 20

Show Details
01/20/2026 03/20/2026
bus icon
D50

Stop Change Bus Stop Reinstallation: 14th St NW at Colorado Ave on January 20

Show Details
01/20/2026 03/20/2026
bus icon
D5X

Stop Change Bus Stop Reinstallation: 14th St NW at Colorado Ave on January 20

Show Details
01/20/2026 03/20/2026
bus icon
M44

Stop Relocation Permanent Bus Stop Relocation on East West Highway and 43rd Street on January 26

Show Details
01/26/2026 04/26/2026
bus icon
P10

Stop Relocation Permanent Bus Stop Relocation on East West Highway and 43rd Street on January 26

Show Details
01/26/2026 04/26/2026
bus icon
C83

Temporary Detour Temporary Detour: Construction on Oregon Ave NW at Nebraska Ave

Show Details
02/04/2026 06/11/2026
station icon
Tenleytown-AU

Escalator Closed On May 4, 2026, Metro will begin Phase 4 to install the canopy above the station escalators at the Tenleytown – AU East Station Entrance.

Show Details
05/04/2026 09/30/2026
station icon
Gallery Pl-Chinatown

Escalator Closed On June 9, 2025, Metro began a major capital project replacing four entrance escalators at Entrance A (7th and F Street, NW), while two escalators are being replaced, the remaining two escalators will remain operational. The project is expected to be completed by April 2026.

Show Details
11/17/2025 04/27/2026
station icon
Grosvenor-Strathmore

Parking Changes On August 4, 2025, Metro began construction on the Grosvenor-Strathmore Joint Development project. The project will transform underutilized land into a vibrant, mixed-use development by building “The Reserve,” a senior living facility that will add to the community fabric of Strathmore Square.

Show Details
08/04/2025 01/01/2028
station icon
Shady Grove

Parking Changes Beginning February 16th, Bus shelters C and D at Shady Grove-East bus loop will temporarily close and relocate to temporary stops T1 (Bus Shelter C) and T2 (Bus Shelter D.) The Kiss & Ride will also be closed during this period. For more information, visit wmata.com/busshelters.

Show Details
02/16/2026 03/02/2026
bus icon
A49

Temporary Detour Temporary Detour: Construction on The Theodore Roosevelt Bridge

Show Details
02/16/2026 07/31/2026
station icon
Shady Grove

General Announcement Beginning February 23, Bus shelters J and K at Shady Grove-West bus loop will temporarily close and relocate to temporary stops T1 (Bus Shelter J) and T2 (Bus Shelter K.) Beginning on March 9, Bus Shelters L and M at Shady Grove-West bus loop will temporarily close and relocation to temporary stops T1 (Bus Shelter L) and T2 (Bus Shelter M.)

Show Details
02/20/2026 04/06/2026
station icon
Twinbrook

General Announcement On March 2nd, Metro will reopen the Twinbrook-East Bus Loop that was previously closed for repairs, for service. Bus routes providing temporary service at temporary stops G, H, J located on Chapman Ave will relocate to resume service at the east loop. Kiss & Ride on east bus loop will reopen. Read advisory for bus route details.

Show Details
03/02/2026 03/15/2026
bus icon
D50

Temporary Detour Temporary Detour: Construction on 14th St February 28

Show Details
02/28/2026 02/28/2026
bus icon
D5X

Temporary Detour Temporary Detour: Construction on 14th St February 28

Show Details
02/28/2026 02/28/2026
bus icon
M12

Stop Relocation Twinbrook Bus Loop Project Completion

Show Details
03/02/2026 04/02/2026
bus icon
D5X

Temporary Detour Temporary Detour: Construction on 14th St NW and Underwood St

Show Details
03/02/2026 03/13/2026
bus icon
D1X

Temporary Detour Temporary Detour: Construction on Constitution Ave NW February 28

Show Details
02/28/2026 02/28/2026
bus icon
D40

Temporary Detour Temporary Detour: Construction on Constitution Ave NW February 28

Show Details
02/28/2026 02/28/2026
bus icon
D4X

Temporary Detour Temporary Detour: Construction on Constitution Ave NW February 28

Show Details
02/28/2026 02/28/2026
bus icon
D60

Temporary Detour Temporary Detour: Construction on Constitution Ave NW February 28

Show Details
02/28/2026 02/28/2026
bus icon
A58

Temporary Detour Temporary Detour: Construction on the Central Place Tower Tunnel in Rosslyn

Show Details
03/01/2026 04/26/2026
bus icon
D30

Temporary Bus Stop Temporary Bus Stop Closure: 12th St NE and Monroe St on February 26

Show Details
02/26/2026 03/26/2026
Route/Line What's Happening Issue Start Date End Date
station icon
L'Enfant Plaza

Escalator Closed In May 2024, Metro continued a major capital project replacing entrance escalators: three at Entrance B (6th St) from late May 2024 to June 2025 and three at Entrance C (9th St) from June 2025 to August 2026.

Show Details
05/17/2024 08/31/2026
station icon
Silver Spring

Rail Station Construction MDOT MTA Purple Line construction crews continue to work on a new mezzanine that will connect the future station to Metro, MARC, and the transit center. Expect construction through 2026.

Show Details
04/13/2023 12/31/2026
station icon
Judiciary Square

Entrance/Exit Inhibited In January 2023, Metro began a capital project to install a new staircase and canopy at Judiciary Square’s north entrance. The stairway is scheduled to open in spring 2026 and canopy construction will begin spring 2026.

Show Details
01/01/2023 12/31/2026
station icon
Arlington Cemetery

Rail Station Construction In June 2023, Metro began a major capital project to install two canopies above the station escalators.

Show Details
06/01/2023 03/31/2026
station icon
Rosslyn

Escalator Closed In January 2024, Metro began a major capital project replacing the four entrance escalators and four platform escalators at Rosslyn Station –all eight escalators are expected to be completed by June 2026.

Show Details
01/02/2024 06/30/2026
station icon
Southern Avenue

Parking Changes In June 2024, Metro began reconfiguring the Kiss & Ride Lot and reopened the lower level of the Park & Ride Lot. Up to 85% of parking spaces in the Kiss & Ride Lot will close indefinitely; but daily parking is available in the Park & Ride (rates apply).

Show Details
06/24/2024 12/31/2026
bus icon
C81

Temporary Detour Temporary Detour: Construction on Kennedy Street NW on June 30

Show Details
06/30/2025 07/06/2026
station icon
East Falls Church

Rail Station Construction,Parking Changes On July 21, 2025, Arlington County/Metro began reconstruction of the Bus Loop. The work will be divided into phases and will take approximately 15 months to complete. Parking facility capacity may be impacted during various phases of the work.

Show Details
07/21/2025 10/21/2026
station icon
Bethesda

Rail Station Construction Metro is building a new mezzanine at the south end of the station, to connect Metro to the future Purple Line Bethesda Station. The mezzanine will not be available until Purple Line opens in 2027.

Show Details
07/28/2025 06/28/2027
station icon
West Hyattsville

Escalator Closed On August 17, 2025, Metro began modernizing the escalators at the West Hyattsville Station. The work will take approximately ten months to complete, and one escalator will be out of service at a time.

Show Details
08/17/2025 06/28/2026
bus icon
C11

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P93

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P94

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P97

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
C11

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P97

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
D74

Temporary Detour Temporary Detour: DDOT Construction Project on Connecticut Ave Underpass Lanes

Show Details
09/23/2025 09/23/2026
bus icon
D96

Temporary Detour Temporary Detour: DDOT Construction Project on Connecticut Ave Underpass Lanes

Show Details
09/23/2025 09/23/2026
station icon
Glenmont

Elevator Closed On September 15, 2025, Metro began rehabilitating one of three elevators in the East Parking Garage. One elevator will be out of service at a time, with the remaining two elevators operational.

Show Details
09/15/2025 07/14/2026
bus icon
P40

Stop Relocation Permanent Bus Stop Relocation: Annapolis Rd at Gallatin St on October 10

Show Details
10/10/2025 10/09/2026
bus icon
C51

Stop Relocation Temporary Bus Stop Closure: 18th St NW at California St on October 10

Show Details
10/10/2025 03/09/2026
bus icon
C53

Stop Relocation Temporary Bus Stop Closure: 18th St NW at California St on October 10

Show Details
10/10/2025 03/09/2026
station icon
West Falls Church

Other (chillers and lighting) In November 2025, Metro began construction at West Falls Church as part of a joint development project. As part of this work, the north parking lot will be closed for the duration of the project; customers should instead utilize the onsite parking garage.

Show Details
10/14/2025 08/01/2027
station icon
U Street/African-Amer Civil War Memorial/Cardozo

Escalator Closed On November 17, 2025, Metro will begin Phase 4 to install the canopy above the station escalators at U Street/African American Civil War Memorial/Cardozo Station.

Show Details
11/17/2025 09/30/2026
bus icon
C41

Temporary Bus Stop Temporary Bus Stop Closure: Construction on 14th St NE

Show Details
10/27/2025 04/22/2026
station icon
Crystal City

Rail Station Construction,Rail Station Closed: No Trains Passing Through Beginning Feb. 14, 2026, Crystal City station will be closed over ten separate weekends until June 2026 as part of the Crystal City second entrance construction project. During impacted weekends, Metro will provide riders with free shuttle buses at impacted stations.

Show Details
12/29/2025 06/30/2026
station icon
Ronald Reagan Washington National Airport

Rail Station Construction,Rail Station Closed: No Trains Passing Through On March 7-8, May 9-10, and May 16-17, 2026, Ronald Reagan Washington National Airport station will be closed as part of the Crystal City second entrance construction project. During impacted weekends, Metro will provide riders with free shuttle buses at impacted stations.

Show Details
12/29/2025 06/30/2026
station icon
Mt Vernon Sq 7th St-Convention Center

Elevator Closed On February 3, 2026, Metro began rehabilitating the back elevator servicing the Platform and Mezzanine levels at Mt Vernon Square Station. The work will take approximately two months to complete, and the elevator will be out of service during that time.

Show Details
02/03/2026 04/14/2026
bus icon
D40

Temporary Bus Stop Temporary Bus Stop Closure: 7th St NW at F St on January 12

Show Details
01/12/2026 01/14/2028
bus icon
A12

Temporary Bus Stop Temporary Bus Stop Changes: S Walter Reed Dr at 9th St on January 12

Show Details
01/12/2026 04/01/2026
bus icon
F28

Service Change Service Change: F28 Additional Trip

Show Details
01/13/2026 03/14/2026
bus icon
D44

Temporary Bus Stop Temporary Bus Stop Closure: Florida Ave NW at W St on February 2

Show Details
02/02/2026 04/02/2026
bus icon
D70

Temporary Bus Stop Temporary Bus Stop Closure: Connecticut Ave NW at R St

Show Details
01/28/2026 04/15/2026
bus icon
D72

Temporary Bus Stop Temporary Bus Stop Closure: Connecticut Ave NW at R St

Show Details
01/28/2026 04/15/2026
bus icon
D70

Temporary Bus Stop Temporary Bus Stop Closure: Connecticut Ave NW at Wyoming Ave

Show Details
01/28/2026 04/15/2026
station icon
Foggy Bottom-GWU

Escalator Closed In January 2026, Metro began replacing one platform escalator and one entrance escalator with new models that are more durable and reliable. All station entrances, the elevator, stairs, and adjacent escalators will remain open. The project is expected to be completed by June, 2026.

Show Details
01/19/2026 06/22/2026
bus icon
C81

Stop Change Bus Stop Reinstallation: 14th St NW at Colorado Ave on January 20

Show Details
01/20/2026 03/20/2026
bus icon
D50

Stop Change Bus Stop Reinstallation: 14th St NW at Colorado Ave on January 20

Show Details
01/20/2026 03/20/2026
bus icon
D5X

Stop Change Bus Stop Reinstallation: 14th St NW at Colorado Ave on January 20

Show Details
01/20/2026 03/20/2026
bus icon
M44

Stop Relocation Permanent Bus Stop Relocation on East West Highway and 43rd Street on January 26

Show Details
01/26/2026 04/26/2026
bus icon
P10

Stop Relocation Permanent Bus Stop Relocation on East West Highway and 43rd Street on January 26

Show Details
01/26/2026 04/26/2026
bus icon
C83

Temporary Detour Temporary Detour: Construction on Oregon Ave NW at Nebraska Ave

Show Details
02/04/2026 06/11/2026
station icon
Tenleytown-AU

Escalator Closed On May 4, 2026, Metro will begin Phase 4 to install the canopy above the station escalators at the Tenleytown – AU East Station Entrance.

Show Details
05/04/2026 09/30/2026
station icon
Gallery Pl-Chinatown

Escalator Closed On June 9, 2025, Metro began a major capital project replacing four entrance escalators at Entrance A (7th and F Street, NW), while two escalators are being replaced, the remaining two escalators will remain operational. The project is expected to be completed by April 2026.

Show Details
11/17/2025 04/27/2026
station icon
Grosvenor-Strathmore

Parking Changes On August 4, 2025, Metro began construction on the Grosvenor-Strathmore Joint Development project. The project will transform underutilized land into a vibrant, mixed-use development by building “The Reserve,” a senior living facility that will add to the community fabric of Strathmore Square.

Show Details
08/04/2025 01/01/2028
station icon
Shady Grove

Parking Changes Beginning February 16th, Bus shelters C and D at Shady Grove-East bus loop will temporarily close and relocate to temporary stops T1 (Bus Shelter C) and T2 (Bus Shelter D.) The Kiss & Ride will also be closed during this period. For more information, visit wmata.com/busshelters.

Show Details
02/16/2026 03/02/2026
bus icon
A49

Temporary Detour Temporary Detour: Construction on The Theodore Roosevelt Bridge

Show Details
02/16/2026 07/31/2026
station icon
Shady Grove

General Announcement Beginning February 23, Bus shelters J and K at Shady Grove-West bus loop will temporarily close and relocate to temporary stops T1 (Bus Shelter J) and T2 (Bus Shelter K.) Beginning on March 9, Bus Shelters L and M at Shady Grove-West bus loop will temporarily close and relocation to temporary stops T1 (Bus Shelter L) and T2 (Bus Shelter M.)

Show Details
02/20/2026 04/06/2026
station icon
Twinbrook

General Announcement On March 2nd, Metro will reopen the Twinbrook-East Bus Loop that was previously closed for repairs, for service. Bus routes providing temporary service at temporary stops G, H, J located on Chapman Ave will relocate to resume service at the east loop. Kiss & Ride on east bus loop will reopen. Read advisory for bus route details.

Show Details
03/02/2026 03/15/2026
bus icon
M12

Stop Relocation Twinbrook Bus Loop Project Completion

Show Details
03/02/2026 04/02/2026
bus icon
D5X

Temporary Detour Temporary Detour: Construction on 14th St NW and Underwood St

Show Details
03/02/2026 03/13/2026
bus icon
A58

Temporary Detour Temporary Detour: Construction on the Central Place Tower Tunnel in Rosslyn

Show Details
03/01/2026 04/26/2026
bus icon
D30

Temporary Bus Stop Temporary Bus Stop Closure: 12th St NE and Monroe St on February 26

Show Details
02/26/2026 03/26/2026
Route/Line What's Happening Issue Start Date End Date
station icon
L'Enfant Plaza

Escalator Closed In May 2024, Metro continued a major capital project replacing entrance escalators: three at Entrance B (6th St) from late May 2024 to June 2025 and three at Entrance C (9th St) from June 2025 to August 2026.

Show Details
05/17/2024 08/31/2026
station icon
Silver Spring

Rail Station Construction MDOT MTA Purple Line construction crews continue to work on a new mezzanine that will connect the future station to Metro, MARC, and the transit center. Expect construction through 2026.

Show Details
04/13/2023 12/31/2026
station icon
Judiciary Square

Entrance/Exit Inhibited In January 2023, Metro began a capital project to install a new staircase and canopy at Judiciary Square’s north entrance. The stairway is scheduled to open in spring 2026 and canopy construction will begin spring 2026.

Show Details
01/01/2023 12/31/2026
station icon
Arlington Cemetery

Rail Station Construction In June 2023, Metro began a major capital project to install two canopies above the station escalators.

Show Details
06/01/2023 03/31/2026
station icon
Rosslyn

Escalator Closed In January 2024, Metro began a major capital project replacing the four entrance escalators and four platform escalators at Rosslyn Station –all eight escalators are expected to be completed by June 2026.

Show Details
01/02/2024 06/30/2026
station icon
Southern Avenue

Parking Changes In June 2024, Metro began reconfiguring the Kiss & Ride Lot and reopened the lower level of the Park & Ride Lot. Up to 85% of parking spaces in the Kiss & Ride Lot will close indefinitely; but daily parking is available in the Park & Ride (rates apply).

Show Details
06/24/2024 12/31/2026
bus icon
C81

Temporary Detour Temporary Detour: Construction on Kennedy Street NW on June 30

Show Details
06/30/2025 07/06/2026
station icon
East Falls Church

Rail Station Construction,Parking Changes On July 21, 2025, Arlington County/Metro began reconstruction of the Bus Loop. The work will be divided into phases and will take approximately 15 months to complete. Parking facility capacity may be impacted during various phases of the work.

Show Details
07/21/2025 10/21/2026
station icon
Bethesda

Rail Station Construction Metro is building a new mezzanine at the south end of the station, to connect Metro to the future Purple Line Bethesda Station. The mezzanine will not be available until Purple Line opens in 2027.

Show Details
07/28/2025 06/28/2027
station icon
West Hyattsville

Escalator Closed On August 17, 2025, Metro began modernizing the escalators at the West Hyattsville Station. The work will take approximately ten months to complete, and one escalator will be out of service at a time.

Show Details
08/17/2025 06/28/2026
bus icon
C15

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C37

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C41

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C51

Temporary Detour Temporary Detour: Construction Potomac Avenue August 26

Show Details
08/26/2025 03/01/2026
bus icon
C11

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P93

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P94

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P97

Stop Relocation Bus Stops Relocation: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
C11

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
P97

Stop Relocation New Bus Stop: Indian Head Highway September 10

Show Details
09/10/2025 09/30/2026
bus icon
D74

Temporary Detour Temporary Detour: DDOT Construction Project on Connecticut Ave Underpass Lanes

Show Details
09/23/2025 09/23/2026
bus icon
D96

Temporary Detour Temporary Detour: DDOT Construction Project on Connecticut Ave Underpass Lanes

Show Details
09/23/2025 09/23/2026
station icon
Glenmont

Elevator Closed On September 15, 2025, Metro began rehabilitating one of three elevators in the East Parking Garage. One elevator will be out of service at a time, with the remaining two elevators operational.

Show Details
09/15/2025 07/14/2026
station icon
Navy Yard-Ballpark

Escalator Closed On September 28, 2025, Metro began a major capital project replacing the three entrance escalators and two platform escalators at the west entrance (at the corner of M and Half Streets, SE). The project is expected to be complete by Spring 2026.

Show Details
09/28/2025 02/27/2026
bus icon
P40

Stop Relocation Permanent Bus Stop Relocation: Annapolis Rd at Gallatin St on October 10

Show Details
10/10/2025 10/09/2026
bus icon
C51

Stop Relocation Temporary Bus Stop Closure: 18th St NW at California St on October 10

Show Details
10/10/2025 03/09/2026
bus icon
C53

Stop Relocation Temporary Bus Stop Closure: 18th St NW at California St on October 10

Show Details
10/10/2025 03/09/2026
station icon
West Falls Church

Other (chillers and lighting) In November 2025, Metro began construction at West Falls Church as part of a joint development project. As part of this work, the north parking lot will be closed for the duration of the project; customers should instead utilize the onsite parking garage.

Show Details
10/14/2025 08/01/2027
station icon
U Street/African-Amer Civil War Memorial/Cardozo

Escalator Closed On November 17, 2025, Metro will begin Phase 4 to install the canopy above the station escalators at U Street/African American Civil War Memorial/Cardozo Station.

Show Details
11/17/2025 09/30/2026
bus icon
C41

Temporary Bus Stop Temporary Bus Stop Closure: Construction on 14th St NE

Show Details
10/27/2025 04/22/2026
station icon
New Carrollton

Elevator Closed On November 17, 2025, Metro began rehabilitating the elevator servicing the mezzanine and street-level at New Carrollton Station on the Ellin Road side. The elevator will be out of service during that time.

Show Details
11/17/2025 02/28/2026
station icon
Twinbrook

Parking Changes Beginning December 15, Metro will begin Phase 2 of the Bus Shelter Installation Project at Twinbrook Metro Station, replacing seven (7) existing bus shelters. The Twinbrook East Bus Loop will remain closed through February 2025 until installation is completed. Bus service will continue to operate from the temporarily relocated stops on Chapman Ave. Bus service will continue to operate from the current temporarily relocated stops on Chapman Ave.

Show Details
12/15/2025 03/01/2026
station icon
Crystal City

Rail Station Construction,Rail Station Closed: No Trains Passing Through Beginning Feb. 14, 2026, Crystal City station will be closed over ten separate weekends until June 2026 as part of the Crystal City second entrance construction project. During impacted weekends, Metro will provide riders with free shuttle buses at impacted stations.

Show Details
12/29/2025 06/30/2026
station icon
Ronald Reagan Washington National Airport

Rail Station Construction,Rail Station Closed: No Trains Passing Through On March 7-8, May 9-10, and May 16-17, 2026, Ronald Reagan Washington National Airport station will be closed as part of the Crystal City second entrance construction project. During impacted weekends, Metro will provide riders with free shuttle buses at impacted stations.

Show Details
12/29/2025 06/30/2026
station icon
Mt Vernon Sq 7th St-Convention Center

Elevator Closed On February 3, 2026, Metro began rehabilitating the back elevator servicing the Platform and Mezzanine levels at Mt Vernon Square Station. The work will take approximately two months to complete, and the elevator will be out of service during that time.

Show Details
02/03/2026 04/14/2026
bus icon
D40

Temporary Bus Stop Temporary Bus Stop Closure: 7th St NW at F St on January 12

Show Details
01/12/2026 01/14/2028
bus icon
A12

Temporary Bus Stop Temporary Bus Stop Changes: S Walter Reed Dr at 9th St on January 12

Show Details
01/12/2026 04/01/2026
bus icon
F28

Service Change Service Change: F28 Additional Trip

Show Details
01/13/2026 03/14/2026
bus icon
D44

Temporary Bus Stop Temporary Bus Stop Closure: Florida Ave NW at W St on February 2

Show Details
02/02/2026 04/02/2026
bus icon
D70

Temporary Bus Stop Temporary Bus Stop Closure: Connecticut Ave NW at R St

Show Details
01/28/2026 04/15/2026
bus icon
D72

Temporary Bus Stop Temporary Bus Stop Closure: Connecticut Ave NW at R St

Show Details
01/28/2026 04/15/2026
bus icon
D70

Temporary Bus Stop Temporary Bus Stop Closure: Connecticut Ave NW at Wyoming Ave

Show Details
01/28/2026 04/15/2026
station icon
Foggy Bottom-GWU

Escalator Closed In January 2026, Metro began replacing one platform escalator and one entrance escalator with new models that are more durable and reliable. All station entrances, the elevator, stairs, and adjacent escalators will remain open. The project is expected to be completed by June, 2026.

Show Details
01/19/2026 06/22/2026
bus icon
C81

Stop Change Bus Stop Reinstallation: 14th St NW at Colorado Ave on January 20

Show Details
01/20/2026 03/20/2026
bus icon
D50

Stop Change Bus Stop Reinstallation: 14th St NW at Colorado Ave on January 20

Show Details
01/20/2026 03/20/2026
bus icon
D5X

Stop Change Bus Stop Reinstallation: 14th St NW at Colorado Ave on January 20

Show Details
01/20/2026 03/20/2026
bus icon
M44

Stop Relocation Permanent Bus Stop Relocation on East West Highway and 43rd Street on January 26

Show Details
01/26/2026 04/26/2026
bus icon
P10

Stop Relocation Permanent Bus Stop Relocation on East West Highway and 43rd Street on January 26

Show Details
01/26/2026 04/26/2026
bus icon
C83

Temporary Detour Temporary Detour: Construction on Oregon Ave NW at Nebraska Ave

Show Details
02/04/2026 06/11/2026
station icon
Tenleytown-AU

Escalator Closed On May 4, 2026, Metro will begin Phase 4 to install the canopy above the station escalators at the Tenleytown – AU East Station Entrance.

Show Details
05/04/2026 09/30/2026
bus icon
C37

Temporary Bus Stop Temporary Bus Stop Closure: 50th St NE and Banks Pl on February 19

Show Details
02/19/2026 02/26/2026
station icon
Gallery Pl-Chinatown

Escalator Closed On June 9, 2025, Metro began a major capital project replacing four entrance escalators at Entrance A (7th and F Street, NW), while two escalators are being replaced, the remaining two escalators will remain operational. The project is expected to be completed by April 2026.

Show Details
11/17/2025 04/27/2026
station icon
Grosvenor-Strathmore

Parking Changes On August 4, 2025, Metro began construction on the Grosvenor-Strathmore Joint Development project. The project will transform underutilized land into a vibrant, mixed-use development by building “The Reserve,” a senior living facility that will add to the community fabric of Strathmore Square.

Show Details
08/04/2025 01/01/2028
station icon
Shady Grove

Parking Changes Beginning February 16th, Bus shelters C and D at Shady Grove-East bus loop will temporarily close and relocate to temporary stops T1 (Bus Shelter C) and T2 (Bus Shelter D.) The Kiss & Ride will also be closed during this period. For more information, visit wmata.com/busshelters.

Show Details
02/16/2026 03/02/2026
bus icon
A49

Temporary Detour Temporary Detour: Construction on The Theodore Roosevelt Bridge

Show Details
02/16/2026 07/31/2026
station icon
Shady Grove

General Announcement Beginning February 23, Bus shelters J and K at Shady Grove-West bus loop will temporarily close and relocate to temporary stops T1 (Bus Shelter J) and T2 (Bus Shelter K.) Beginning on March 9, Bus Shelters L and M at Shady Grove-West bus loop will temporarily close and relocation to temporary stops T1 (Bus Shelter L) and T2 (Bus Shelter M.)

Show Details
02/20/2026 04/06/2026
station icon
Twinbrook

General Announcement On March 2nd, Metro will reopen the Twinbrook-East Bus Loop that was previously closed for repairs, for service. Bus routes providing temporary service at temporary stops G, H, J located on Chapman Ave will relocate to resume service at the east loop. Kiss & Ride on east bus loop will reopen. Read advisory for bus route details.

Show Details
03/02/2026 03/15/2026
bus icon
D50

Temporary Detour Temporary Detour: Construction on 14th St February 28

Show Details
02/28/2026 02/28/2026
bus icon
D5X

Temporary Detour Temporary Detour: Construction on 14th St February 28

Show Details
02/28/2026 02/28/2026
bus icon
M12

Stop Relocation Twinbrook Bus Loop Project Completion

Show Details
03/02/2026 04/02/2026
bus icon
D5X

Temporary Detour Temporary Detour: Construction on 14th St NW and Underwood St

Show Details
03/02/2026 03/13/2026
bus icon
D1X

Temporary Detour Temporary Detour: Construction on Constitution Ave NW February 28

Show Details
02/28/2026 02/28/2026
bus icon
D40

Temporary Detour Temporary Detour: Construction on Constitution Ave NW February 28

Show Details
02/28/2026 02/28/2026
bus icon
D4X

Temporary Detour Temporary Detour: Construction on Constitution Ave NW February 28

Show Details
02/28/2026 02/28/2026
bus icon
D60

Temporary Detour Temporary Detour: Construction on Constitution Ave NW February 28

Show Details
02/28/2026 02/28/2026
bus icon
A58

Temporary Detour Temporary Detour: Construction on the Central Place Tower Tunnel in Rosslyn

Show Details
03/01/2026 04/26/2026
bus icon
D30

Temporary Bus Stop Temporary Bus Stop Closure: 12th St NE and Monroe St on February 26

Show Details
02/26/2026 03/26/2026