Status and Alerts
System Status
05:54 PM on Friday, August 22
map
Events & Announcements
Service Changes & Station Construction
Route/Line | What's Happening | Issue | Start Date | End Date |
---|---|---|---|---|
|
Rail Station Construction |
Due to joint development and other construction activities, parking, traffic and pedestrian access may be impacted.
Show Details |
07/01/2019 | 12/31/2026 |
|
Escalator Closed |
In May 2024, Metro continued a major capital project replacing entrance escalators: three at Entrance B (6th St) from late May 2024 to June 2025 and three at Entrance C (9th St) from June 2025 to August 2026.
Show Details |
05/17/2024 | 08/31/2026 |
|
Rail Station Construction |
Additionally, MDOT MTA Purple Line construction crews continue to work on a new mezzanine that will connect the future station to Metro, MARC, and the transit center. Expect construction through 2026.
Show Details |
04/13/2023 | 05/01/2026 |
|
Entrance/Exit Inhibited |
In January 2023, Metro began a capital project to install a new staircase and canopy at Judiciary Square’s north entrance. The stairway is scheduled to open in spring 2025 and canopy construction will begin by fall 2025.
Show Details |
01/01/2023 | 12/31/2026 |
|
Elevator Closed,Escalator Closed |
In March 2024, Metro began a major capital project replacing three entrance escalators at Dupont Circle’s north entrance – all three are expected to be completed by fall 2025.
Show Details |
03/04/2024 | 10/31/2025 |
|
Rail Station Construction |
In June 2023, Metro began a major capital project to install two canopies above the station escalators.
Show Details |
06/01/2023 | 03/31/2026 |
|
Parking Changes |
50% of the Kiss & Ride Lot at Fort Totten Station closed for repairs. During this time, daily parking is available in the Park & Ride (rates apply).
Show Details |
09/01/2024 | 12/31/2025 |
|
Elevator Closed,Escalator Closed |
In Summer 2025, Metro will begin a major capital project replacing four entrance escalators at Gallery Place Station’s Entrance A (7th and F Street, NW).
Show Details |
05/12/2025 | 11/07/2025 |
|
Escalator Closed |
In January 2024, Metro began a major capital project replacing the four entrance escalators and four platform escalators at Rosslyn Station –all eight escalators are expected to be completed by May 2026.
Show Details |
01/02/2024 | 06/30/2026 |
|
Parking Changes |
In June 2024, Metro began reconfiguring the Kiss & Ride Lot and reopened the lower level of the Park & Ride Lot. Up to 85% of parking spaces in the Kiss & Ride Lot will close indefinitely; but daily parking is available in the Park & Ride (rates apply).
Show Details |
06/24/2024 | 12/31/2026 |
|
Parking Changes |
Metro is currently repairing the south parking garage. To facilitate this, up to 25% of spaces will be closed through late summer 2025. While we make improvements to enhance safety and deliver a better customer experience, expect reduced parking availability.
Show Details |
06/01/2024 | 09/30/2025 |
|
Escalator Closed |
In August 2024, Metro began a major capital project replacing six escalators at Crystal City – they will all be replaced by early September 2025.
Show Details |
08/05/2024 | 09/08/2025 |
|
Escalator Closed |
In September 2024, Metro began a major capital project replacing the three entrance escalators and one platform escalator at the east entrance.
The entire escalator replacement project is anticipated to be complete in Spring 2026.
Show Details |
09/30/2024 | 04/01/2026 |
P30 |
Temporary Detour |
Temporary Detour: MDOT MTA Purple Line Project on June 29
Show Details |
06/29/2025 | 09/05/2025 |
D90 |
Temporary Detour |
Temporary Detour: Construction on Cathedral Avenue NW on June 29
Show Details |
06/29/2025 | 10/29/2025 |
C85 |
Temporary Detour |
Temporary Detour: Construction on MacArthur Boulevard NW on June 29
Show Details |
06/29/2025 | 08/25/2025 |
D50 |
Temporary Bus Stop |
Temporary Bus Stop Closure: 14th Street NW at Decatur Street on June 29
Show Details |
06/29/2025 | 12/31/2025 |
D44 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Rock Creek Church Rd NW at Allison St on June 29
Show Details |
06/29/2025 | 12/01/2025 |
D74 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Rock Creek Church Rd NW at Allison St on June 29
Show Details |
06/29/2025 | 12/01/2025 |
F23 |
Temporary Detour |
Long Term Detour: Landmark West End Development on June 29
Show Details |
06/29/2025 | 12/31/2025 |
F24 |
Temporary Detour |
Long Term Detour: Landmark West End Development on June 29
Show Details |
06/29/2025 | 12/31/2025 |
A40 |
Stop Relocation |
Temporary Bus Stop Relocation: Columbia Pike at S Scott St on June 29
Show Details |
06/29/2025 | 08/28/2025 |
C51 |
Temporary Bus Stop |
Temporary Bus Stop Closure: New Jersey Avenue NW at Rhode Island Avenue on June 29
Show Details |
06/29/2025 | 09/30/2025 |
P42 |
Temporary Detour |
Temporary Detour: Construction on Powhatan Street Bridge on June 30
Show Details |
06/29/2025 | 10/29/2025 |
D36 |
Stop Discontinued |
Permanent Bus Stop Closure: 4th Street NE and Rhode Island Avenue on June 29
Show Details |
06/29/2025 | 10/29/2025 |
D36 |
Stop Change |
Permanent Bus Stop Adjustment: 13th Street and I Street NW on June 29
Show Details |
06/29/2025 | 10/29/2025 |
C81 |
Temporary Detour |
Temporary Detour: Construction on Kennedy Street NW on June 30
Show Details |
06/30/2025 | 10/30/2025 |
C41 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Potomac Avenue SE at 14th Street on July 1
Show Details |
07/01/2025 | 10/30/2025 |
C51 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Potomac Avenue SE at 14th Street on July 1
Show Details |
07/01/2025 | 10/30/2025 |
C15 |
Stop Discontinued |
Permanent Bus Stop Closure: Pennsylvania Avenue SE at 15th Street on July 3
Show Details |
07/03/2025 | 11/03/2025 |
C37 |
Stop Discontinued |
Permanent Bus Stop Closure: Pennsylvania Avenue SE at 15th Street on July 3
Show Details |
07/03/2025 | 11/03/2025 |
D10 |
Stop Discontinued |
Permanent Bus Stop Closure: Pennsylvania Avenue SE at 15th Street on July 3
Show Details |
07/03/2025 | 11/03/2025 |
C37 |
Temporary Detour |
Temporary Detour: 41st St SE and Southern Ave on July 3rd
Show Details |
07/03/2025 | 12/03/2025 |
C31 |
Service Change |
Westbound C31 Routing Change Beginning on July 4
Show Details |
07/04/2025 | 10/06/2025 |
|
Elevator Closed |
On July 16, 2025, Metro began rehabilitating the elevator (C08X01) at Pentagon City Station. The work will take approximately two months to complete, and the elevator will be out of service during that time.
Show Details |
07/16/2025 | 09/23/2025 |
|
Rail Station Construction |
From Aug. 2-31, 2025, Branch Av will be closed as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
From Aug. 2-31, 2025, Suitland will be closed as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
From Aug. 2-31, 2025, Naylor Rd will be closed as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
From Aug. 2-31, 2025, Green Line service will terminate at Southern Av as part of Metro's Green Line Major Construction. Additionally, for two weekends, Aug. 9-10 and Aug. 16-17, 2025, Southern Av will be closed.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
For two weekends, Aug. 9-10 and Aug. 16-17, 2025, Congress Heights will be closed as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
For two weekends, Aug. 9-10 and Aug. 16-17, 2025, Green Line service will terminate at Anacostia as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
C81 |
Stop Relocation |
Temporary Bus Stop Relocation: Military Road NW at 14th St on July 11
Show Details |
07/11/2025 | 01/11/2026 |
M70 |
Stop Relocation |
Bus Stop Relocation: Old Georgetown Road at Commerce Lane on July 15
Show Details |
07/15/2025 | 11/15/2025 |
F23 |
Temporary Detour |
Temporary Detour: Rock the Block Events
Show Details |
07/25/2025 | 10/31/2025 |
A40 |
Stop Relocation |
Bus Stop Relocation: Columbia Pike Project, July 21
Show Details |
07/21/2025 | 10/15/2025 |
A49 |
Stop Relocation |
Bus Stop Relocation: Columbia Pike Project, July 21
Show Details |
07/21/2025 | 10/15/2025 |
F44 |
Stop Relocation |
Bus Stop Relocation: Columbia Pike Project, July 21
Show Details |
07/21/2025 | 10/15/2025 |
|
Rail Station Construction,Parking Changes |
On July 21, 2025, Arlington County/Metro began reconstruction of the Bus Loop. The work will be divided into three overall phases and will take approximately 15 months to complete.
Show Details |
07/21/2025 | 10/21/2026 |
D40 |
Stop Relocation |
Permanent Bus Stop Relocation: Georgia Avenue NW and Kennedy Street
Show Details |
07/28/2025 | 11/28/2025 |
D4X |
Stop Relocation |
Permanent Bus Stop Relocation: Georgia Avenue NW and Kennedy Street
Show Details |
07/28/2025 | 11/28/2025 |
D50 |
Temporary Bus Stop |
Temporary Bus Stop Closure: 14th Street NW and Jefferson Street
Show Details |
07/28/2025 | 11/28/2025 |
D5X |
Temporary Bus Stop |
Temporary Bus Stop Closure: 14th Street NW and Jefferson Street
Show Details |
07/28/2025 | 11/28/2025 |
P90 |
Stop Relocation |
Permanent Bus Stop Relocation: St Barnabas Road at Bedford Way
Show Details |
07/25/2025 | 11/25/2025 |
M12 |
Temporary Bus Stop |
Temporary Bus Stop Relocation: Twinbrook Station
Show Details |
07/27/2025 | 09/30/2025 |
P31 |
Stop Relocation |
Permanent Bus Stop Relocation: Merrimac Drive
Show Details |
07/27/2025 | 11/27/2025 |
|
Parking Changes |
Beginning Sunday, July 27, 2025, Metro will rehabilitate surface parking lots and the East Bus Loop at Twinbrook Station to enhance safety and improve the customer experience. During this work, customers should expect up to a 15% reduction in parking availability.
Show Details |
07/27/2025 | 11/30/2025 |
M12 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Twinbrook Station Bus Bay A on August 4
Show Details |
08/04/2025 | 10/04/2025 |
A40 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Westbound Columbia Pike on August 11
Show Details |
08/11/2025 | 10/11/2025 |
F44 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Westbound Columbia Pike on August 11
Show Details |
08/11/2025 | 10/11/2025 |
P24 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Good Luck Road at Cipriano Road
Show Details |
08/12/2025 | 12/12/2025 |
|
Rail Station Construction |
Metro is building a new mezzanine at the south end of the station, to connect Metro to the future Purple Line Bethesda Station. The mezzanine will not be available until Purple Line opens in 2027.
Show Details |
07/28/2025 | 09/30/2026 |
|
Elevator Closed |
This is a reminder that the elevators on both sides of the pedestrian bridge, that goes across East-West Hwy near Hyattsville Crossing Station, have been closed indefinitely.
Show Details |
08/11/2025 | 09/15/2025 |
P14 |
Stop Change |
Stop Change: Cunningham Dr at Pontiac St on August 11
Show Details |
08/15/2025 | 10/11/2025 |
P41 |
Stop Change |
Stop Change: Landover Rd at Brightseat Rd on August 14
Show Details |
08/15/2025 | 10/11/2025 |
C31 |
Stop Change |
Bus Stop Changes: Route C31 on August 18
Show Details |
08/18/2025 | 11/28/2025 |
P41 |
Temporary Detour |
Temporary Detour: Washington Commanders vs Baltimore Ravens on August 23
Show Details |
08/23/2025 | 08/23/2025 |
P61 |
Temporary Detour |
Temporary Detour: Washington Commanders vs Baltimore Ravens on August 23
Show Details |
08/23/2025 | 08/23/2025 |
C53 |
Stop Discontinued |
Permanent Bus Stop Closure: 8th St SE and D St SE
Show Details |
08/20/2025 | 12/31/2025 |
|
Escalator Closed |
On August 17, 2025, Metro began modernizing the escalator at the West Hyattsville Station. The work will take approximately two months to complete, and that escalator will be out of service during that time.
Show Details |
08/17/2025 | 12/07/2025 |
C85 |
Temporary Detour |
Temporary Detour: Construction on Edmund St NW
Show Details |
08/20/2025 | 08/24/2025 |
D96 |
Temporary Detour |
Temporary Detour: Construction on Edmund St NW
Show Details |
08/20/2025 | 08/24/2025 |
A58 |
Temporary Detour |
Temporary Detour: Construction Wilson Boulevard August 24
Show Details |
08/24/2025 | 08/24/2025 |
A76 |
Temporary Detour |
Temporary Detour: Construction Wilson Boulevard August 24
Show Details |
08/24/2025 | 08/24/2025 |
F62 |
Temporary Detour |
Temporary Detour: Construction Wilson Boulevard August 24
Show Details |
08/24/2025 | 08/24/2025 |
C53 |
Stop Relocation |
Bus Stop Relocation: 8th St SE at D St on August 22
Show Details |
08/22/2025 | 10/22/2025 |
C53 |
Temporary Detour |
Temporary Detour: Construction on Florida Ave Between 3rd St NE and 4th St on August 23
Show Details |
08/23/2025 | 08/23/2025 |
A76 |
Temporary Detour |
Temporary Detour: Construction on N Fairfax Dr
Show Details |
08/24/2025 | 08/28/2025 |
A1X |
Temporary Detour |
Temporary Detour: A1X to Braddock Rd August 24
Show Details |
08/24/2025 | 11/22/2025 |
C85 |
Stop Discontinued |
Permanent Bus Stop Closure: Macarthur Blvd on August 22
Show Details |
08/22/2025 | 12/22/2025 |
D94 |
Stop Discontinued |
Permanent Bus Stop Closure: Macarthur Blvd on August 22
Show Details |
08/22/2025 | 12/22/2025 |
Route/Line | What's Happening | Issue | Start Date | End Date |
---|---|---|---|---|
|
Rail Station Construction |
Due to joint development and other construction activities, parking, traffic and pedestrian access may be impacted.
Show Details |
07/01/2019 | 12/31/2026 |
|
Escalator Closed |
In May 2024, Metro continued a major capital project replacing entrance escalators: three at Entrance B (6th St) from late May 2024 to June 2025 and three at Entrance C (9th St) from June 2025 to August 2026.
Show Details |
05/17/2024 | 08/31/2026 |
|
Rail Station Construction |
Additionally, MDOT MTA Purple Line construction crews continue to work on a new mezzanine that will connect the future station to Metro, MARC, and the transit center. Expect construction through 2026.
Show Details |
04/13/2023 | 05/01/2026 |
|
Entrance/Exit Inhibited |
In January 2023, Metro began a capital project to install a new staircase and canopy at Judiciary Square’s north entrance. The stairway is scheduled to open in spring 2025 and canopy construction will begin by fall 2025.
Show Details |
01/01/2023 | 12/31/2026 |
|
Elevator Closed,Escalator Closed |
In March 2024, Metro began a major capital project replacing three entrance escalators at Dupont Circle’s north entrance – all three are expected to be completed by fall 2025.
Show Details |
03/04/2024 | 10/31/2025 |
|
Rail Station Construction |
In June 2023, Metro began a major capital project to install two canopies above the station escalators.
Show Details |
06/01/2023 | 03/31/2026 |
|
Parking Changes |
50% of the Kiss & Ride Lot at Fort Totten Station closed for repairs. During this time, daily parking is available in the Park & Ride (rates apply).
Show Details |
09/01/2024 | 12/31/2025 |
|
Elevator Closed,Escalator Closed |
In Summer 2025, Metro will begin a major capital project replacing four entrance escalators at Gallery Place Station’s Entrance A (7th and F Street, NW).
Show Details |
05/12/2025 | 11/07/2025 |
|
Escalator Closed |
In January 2024, Metro began a major capital project replacing the four entrance escalators and four platform escalators at Rosslyn Station –all eight escalators are expected to be completed by May 2026.
Show Details |
01/02/2024 | 06/30/2026 |
|
Parking Changes |
In June 2024, Metro began reconfiguring the Kiss & Ride Lot and reopened the lower level of the Park & Ride Lot. Up to 85% of parking spaces in the Kiss & Ride Lot will close indefinitely; but daily parking is available in the Park & Ride (rates apply).
Show Details |
06/24/2024 | 12/31/2026 |
|
Parking Changes |
Metro is currently repairing the south parking garage. To facilitate this, up to 25% of spaces will be closed through late summer 2025. While we make improvements to enhance safety and deliver a better customer experience, expect reduced parking availability.
Show Details |
06/01/2024 | 09/30/2025 |
|
Escalator Closed |
In August 2024, Metro began a major capital project replacing six escalators at Crystal City – they will all be replaced by early September 2025.
Show Details |
08/05/2024 | 09/08/2025 |
|
Escalator Closed |
In September 2024, Metro began a major capital project replacing the three entrance escalators and one platform escalator at the east entrance.
The entire escalator replacement project is anticipated to be complete in Spring 2026.
Show Details |
09/30/2024 | 04/01/2026 |
P30 |
Temporary Detour |
Temporary Detour: MDOT MTA Purple Line Project on June 29
Show Details |
06/29/2025 | 09/05/2025 |
D90 |
Temporary Detour |
Temporary Detour: Construction on Cathedral Avenue NW on June 29
Show Details |
06/29/2025 | 10/29/2025 |
C85 |
Temporary Detour |
Temporary Detour: Construction on MacArthur Boulevard NW on June 29
Show Details |
06/29/2025 | 08/25/2025 |
D50 |
Temporary Bus Stop |
Temporary Bus Stop Closure: 14th Street NW at Decatur Street on June 29
Show Details |
06/29/2025 | 12/31/2025 |
D44 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Rock Creek Church Rd NW at Allison St on June 29
Show Details |
06/29/2025 | 12/01/2025 |
D74 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Rock Creek Church Rd NW at Allison St on June 29
Show Details |
06/29/2025 | 12/01/2025 |
F23 |
Temporary Detour |
Long Term Detour: Landmark West End Development on June 29
Show Details |
06/29/2025 | 12/31/2025 |
F24 |
Temporary Detour |
Long Term Detour: Landmark West End Development on June 29
Show Details |
06/29/2025 | 12/31/2025 |
A40 |
Stop Relocation |
Temporary Bus Stop Relocation: Columbia Pike at S Scott St on June 29
Show Details |
06/29/2025 | 08/28/2025 |
C51 |
Temporary Bus Stop |
Temporary Bus Stop Closure: New Jersey Avenue NW at Rhode Island Avenue on June 29
Show Details |
06/29/2025 | 09/30/2025 |
P42 |
Temporary Detour |
Temporary Detour: Construction on Powhatan Street Bridge on June 30
Show Details |
06/29/2025 | 10/29/2025 |
D36 |
Stop Discontinued |
Permanent Bus Stop Closure: 4th Street NE and Rhode Island Avenue on June 29
Show Details |
06/29/2025 | 10/29/2025 |
D36 |
Stop Change |
Permanent Bus Stop Adjustment: 13th Street and I Street NW on June 29
Show Details |
06/29/2025 | 10/29/2025 |
C81 |
Temporary Detour |
Temporary Detour: Construction on Kennedy Street NW on June 30
Show Details |
06/30/2025 | 10/30/2025 |
C41 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Potomac Avenue SE at 14th Street on July 1
Show Details |
07/01/2025 | 10/30/2025 |
C51 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Potomac Avenue SE at 14th Street on July 1
Show Details |
07/01/2025 | 10/30/2025 |
C15 |
Stop Discontinued |
Permanent Bus Stop Closure: Pennsylvania Avenue SE at 15th Street on July 3
Show Details |
07/03/2025 | 11/03/2025 |
C37 |
Stop Discontinued |
Permanent Bus Stop Closure: Pennsylvania Avenue SE at 15th Street on July 3
Show Details |
07/03/2025 | 11/03/2025 |
D10 |
Stop Discontinued |
Permanent Bus Stop Closure: Pennsylvania Avenue SE at 15th Street on July 3
Show Details |
07/03/2025 | 11/03/2025 |
C37 |
Temporary Detour |
Temporary Detour: 41st St SE and Southern Ave on July 3rd
Show Details |
07/03/2025 | 12/03/2025 |
C31 |
Service Change |
Westbound C31 Routing Change Beginning on July 4
Show Details |
07/04/2025 | 10/06/2025 |
|
Elevator Closed |
On July 16, 2025, Metro began rehabilitating the elevator (C08X01) at Pentagon City Station. The work will take approximately two months to complete, and the elevator will be out of service during that time.
Show Details |
07/16/2025 | 09/23/2025 |
|
Rail Station Construction |
From Aug. 2-31, 2025, Branch Av will be closed as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
From Aug. 2-31, 2025, Suitland will be closed as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
From Aug. 2-31, 2025, Naylor Rd will be closed as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
From Aug. 2-31, 2025, Green Line service will terminate at Southern Av as part of Metro's Green Line Major Construction. Additionally, for two weekends, Aug. 9-10 and Aug. 16-17, 2025, Southern Av will be closed.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
For two weekends, Aug. 9-10 and Aug. 16-17, 2025, Congress Heights will be closed as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
For two weekends, Aug. 9-10 and Aug. 16-17, 2025, Green Line service will terminate at Anacostia as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
C81 |
Stop Relocation |
Temporary Bus Stop Relocation: Military Road NW at 14th St on July 11
Show Details |
07/11/2025 | 01/11/2026 |
M70 |
Stop Relocation |
Bus Stop Relocation: Old Georgetown Road at Commerce Lane on July 15
Show Details |
07/15/2025 | 11/15/2025 |
F23 |
Temporary Detour |
Temporary Detour: Rock the Block Events
Show Details |
07/25/2025 | 10/31/2025 |
A40 |
Stop Relocation |
Bus Stop Relocation: Columbia Pike Project, July 21
Show Details |
07/21/2025 | 10/15/2025 |
A49 |
Stop Relocation |
Bus Stop Relocation: Columbia Pike Project, July 21
Show Details |
07/21/2025 | 10/15/2025 |
F44 |
Stop Relocation |
Bus Stop Relocation: Columbia Pike Project, July 21
Show Details |
07/21/2025 | 10/15/2025 |
|
Rail Station Construction,Parking Changes |
On July 21, 2025, Arlington County/Metro began reconstruction of the Bus Loop. The work will be divided into three overall phases and will take approximately 15 months to complete.
Show Details |
07/21/2025 | 10/21/2026 |
D40 |
Stop Relocation |
Permanent Bus Stop Relocation: Georgia Avenue NW and Kennedy Street
Show Details |
07/28/2025 | 11/28/2025 |
D4X |
Stop Relocation |
Permanent Bus Stop Relocation: Georgia Avenue NW and Kennedy Street
Show Details |
07/28/2025 | 11/28/2025 |
D50 |
Temporary Bus Stop |
Temporary Bus Stop Closure: 14th Street NW and Jefferson Street
Show Details |
07/28/2025 | 11/28/2025 |
D5X |
Temporary Bus Stop |
Temporary Bus Stop Closure: 14th Street NW and Jefferson Street
Show Details |
07/28/2025 | 11/28/2025 |
P90 |
Stop Relocation |
Permanent Bus Stop Relocation: St Barnabas Road at Bedford Way
Show Details |
07/25/2025 | 11/25/2025 |
M12 |
Temporary Bus Stop |
Temporary Bus Stop Relocation: Twinbrook Station
Show Details |
07/27/2025 | 09/30/2025 |
P31 |
Stop Relocation |
Permanent Bus Stop Relocation: Merrimac Drive
Show Details |
07/27/2025 | 11/27/2025 |
|
Parking Changes |
Beginning Sunday, July 27, 2025, Metro will rehabilitate surface parking lots and the East Bus Loop at Twinbrook Station to enhance safety and improve the customer experience. During this work, customers should expect up to a 15% reduction in parking availability.
Show Details |
07/27/2025 | 11/30/2025 |
M12 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Twinbrook Station Bus Bay A on August 4
Show Details |
08/04/2025 | 10/04/2025 |
A40 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Westbound Columbia Pike on August 11
Show Details |
08/11/2025 | 10/11/2025 |
F44 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Westbound Columbia Pike on August 11
Show Details |
08/11/2025 | 10/11/2025 |
P24 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Good Luck Road at Cipriano Road
Show Details |
08/12/2025 | 12/12/2025 |
|
Rail Station Construction |
Metro is building a new mezzanine at the south end of the station, to connect Metro to the future Purple Line Bethesda Station. The mezzanine will not be available until Purple Line opens in 2027.
Show Details |
07/28/2025 | 09/30/2026 |
|
Elevator Closed |
This is a reminder that the elevators on both sides of the pedestrian bridge, that goes across East-West Hwy near Hyattsville Crossing Station, have been closed indefinitely.
Show Details |
08/11/2025 | 09/15/2025 |
P14 |
Stop Change |
Stop Change: Cunningham Dr at Pontiac St on August 11
Show Details |
08/15/2025 | 10/11/2025 |
P41 |
Stop Change |
Stop Change: Landover Rd at Brightseat Rd on August 14
Show Details |
08/15/2025 | 10/11/2025 |
C31 |
Stop Change |
Bus Stop Changes: Route C31 on August 18
Show Details |
08/18/2025 | 11/28/2025 |
P41 |
Temporary Detour |
Temporary Detour: Washington Commanders vs Baltimore Ravens on August 23
Show Details |
08/23/2025 | 08/23/2025 |
P61 |
Temporary Detour |
Temporary Detour: Washington Commanders vs Baltimore Ravens on August 23
Show Details |
08/23/2025 | 08/23/2025 |
C53 |
Stop Discontinued |
Permanent Bus Stop Closure: 8th St SE and D St SE
Show Details |
08/20/2025 | 12/31/2025 |
|
Escalator Closed |
On August 17, 2025, Metro began modernizing the escalator at the West Hyattsville Station. The work will take approximately two months to complete, and that escalator will be out of service during that time.
Show Details |
08/17/2025 | 12/07/2025 |
C85 |
Temporary Detour |
Temporary Detour: Construction on Edmund St NW
Show Details |
08/20/2025 | 08/24/2025 |
D96 |
Temporary Detour |
Temporary Detour: Construction on Edmund St NW
Show Details |
08/20/2025 | 08/24/2025 |
A58 |
Temporary Detour |
Temporary Detour: Construction Wilson Boulevard August 24
Show Details |
08/24/2025 | 08/24/2025 |
A76 |
Temporary Detour |
Temporary Detour: Construction Wilson Boulevard August 24
Show Details |
08/24/2025 | 08/24/2025 |
F62 |
Temporary Detour |
Temporary Detour: Construction Wilson Boulevard August 24
Show Details |
08/24/2025 | 08/24/2025 |
C53 |
Stop Relocation |
Bus Stop Relocation: 8th St SE at D St on August 22
Show Details |
08/22/2025 | 10/22/2025 |
C53 |
Temporary Detour |
Temporary Detour: Construction on Florida Ave Between 3rd St NE and 4th St on August 23
Show Details |
08/23/2025 | 08/23/2025 |
A76 |
Temporary Detour |
Temporary Detour: Construction on N Fairfax Dr
Show Details |
08/24/2025 | 08/28/2025 |
A1X |
Temporary Detour |
Temporary Detour: A1X to Braddock Rd August 24
Show Details |
08/24/2025 | 11/22/2025 |
C85 |
Stop Discontinued |
Permanent Bus Stop Closure: Macarthur Blvd on August 22
Show Details |
08/22/2025 | 12/22/2025 |
D94 |
Stop Discontinued |
Permanent Bus Stop Closure: Macarthur Blvd on August 22
Show Details |
08/22/2025 | 12/22/2025 |
Route/Line | What's Happening | Issue | Start Date | End Date |
---|---|---|---|---|
|
Rail Station Construction |
Due to joint development and other construction activities, parking, traffic and pedestrian access may be impacted.
Show Details |
07/01/2019 | 12/31/2026 |
|
Escalator Closed |
In May 2024, Metro continued a major capital project replacing entrance escalators: three at Entrance B (6th St) from late May 2024 to June 2025 and three at Entrance C (9th St) from June 2025 to August 2026.
Show Details |
05/17/2024 | 08/31/2026 |
|
Rail Station Construction |
Additionally, MDOT MTA Purple Line construction crews continue to work on a new mezzanine that will connect the future station to Metro, MARC, and the transit center. Expect construction through 2026.
Show Details |
04/13/2023 | 05/01/2026 |
|
Entrance/Exit Inhibited |
In January 2023, Metro began a capital project to install a new staircase and canopy at Judiciary Square’s north entrance. The stairway is scheduled to open in spring 2025 and canopy construction will begin by fall 2025.
Show Details |
01/01/2023 | 12/31/2026 |
|
Elevator Closed,Escalator Closed |
In March 2024, Metro began a major capital project replacing three entrance escalators at Dupont Circle’s north entrance – all three are expected to be completed by fall 2025.
Show Details |
03/04/2024 | 10/31/2025 |
|
Rail Station Construction |
In June 2023, Metro began a major capital project to install two canopies above the station escalators.
Show Details |
06/01/2023 | 03/31/2026 |
|
Parking Changes |
50% of the Kiss & Ride Lot at Fort Totten Station closed for repairs. During this time, daily parking is available in the Park & Ride (rates apply).
Show Details |
09/01/2024 | 12/31/2025 |
|
Elevator Closed,Escalator Closed |
In Summer 2025, Metro will begin a major capital project replacing four entrance escalators at Gallery Place Station’s Entrance A (7th and F Street, NW).
Show Details |
05/12/2025 | 11/07/2025 |
|
Escalator Closed |
In January 2024, Metro began a major capital project replacing the four entrance escalators and four platform escalators at Rosslyn Station –all eight escalators are expected to be completed by May 2026.
Show Details |
01/02/2024 | 06/30/2026 |
|
Parking Changes |
In June 2024, Metro began reconfiguring the Kiss & Ride Lot and reopened the lower level of the Park & Ride Lot. Up to 85% of parking spaces in the Kiss & Ride Lot will close indefinitely; but daily parking is available in the Park & Ride (rates apply).
Show Details |
06/24/2024 | 12/31/2026 |
|
Parking Changes |
Metro is currently repairing the south parking garage. To facilitate this, up to 25% of spaces will be closed through late summer 2025. While we make improvements to enhance safety and deliver a better customer experience, expect reduced parking availability.
Show Details |
06/01/2024 | 09/30/2025 |
|
Escalator Closed |
In August 2024, Metro began a major capital project replacing six escalators at Crystal City – they will all be replaced by early September 2025.
Show Details |
08/05/2024 | 09/08/2025 |
|
Escalator Closed |
In September 2024, Metro began a major capital project replacing the three entrance escalators and one platform escalator at the east entrance.
The entire escalator replacement project is anticipated to be complete in Spring 2026.
Show Details |
09/30/2024 | 04/01/2026 |
P30 |
Temporary Detour |
Temporary Detour: MDOT MTA Purple Line Project on June 29
Show Details |
06/29/2025 | 09/05/2025 |
D90 |
Temporary Detour |
Temporary Detour: Construction on Cathedral Avenue NW on June 29
Show Details |
06/29/2025 | 10/29/2025 |
C85 |
Temporary Detour |
Temporary Detour: Construction on MacArthur Boulevard NW on June 29
Show Details |
06/29/2025 | 08/25/2025 |
D50 |
Temporary Bus Stop |
Temporary Bus Stop Closure: 14th Street NW at Decatur Street on June 29
Show Details |
06/29/2025 | 12/31/2025 |
D44 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Rock Creek Church Rd NW at Allison St on June 29
Show Details |
06/29/2025 | 12/01/2025 |
D74 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Rock Creek Church Rd NW at Allison St on June 29
Show Details |
06/29/2025 | 12/01/2025 |
F23 |
Temporary Detour |
Long Term Detour: Landmark West End Development on June 29
Show Details |
06/29/2025 | 12/31/2025 |
F24 |
Temporary Detour |
Long Term Detour: Landmark West End Development on June 29
Show Details |
06/29/2025 | 12/31/2025 |
A40 |
Stop Relocation |
Temporary Bus Stop Relocation: Columbia Pike at S Scott St on June 29
Show Details |
06/29/2025 | 08/28/2025 |
C51 |
Temporary Bus Stop |
Temporary Bus Stop Closure: New Jersey Avenue NW at Rhode Island Avenue on June 29
Show Details |
06/29/2025 | 09/30/2025 |
P42 |
Temporary Detour |
Temporary Detour: Construction on Powhatan Street Bridge on June 30
Show Details |
06/29/2025 | 10/29/2025 |
D36 |
Stop Discontinued |
Permanent Bus Stop Closure: 4th Street NE and Rhode Island Avenue on June 29
Show Details |
06/29/2025 | 10/29/2025 |
D36 |
Stop Change |
Permanent Bus Stop Adjustment: 13th Street and I Street NW on June 29
Show Details |
06/29/2025 | 10/29/2025 |
C81 |
Temporary Detour |
Temporary Detour: Construction on Kennedy Street NW on June 30
Show Details |
06/30/2025 | 10/30/2025 |
C41 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Potomac Avenue SE at 14th Street on July 1
Show Details |
07/01/2025 | 10/30/2025 |
C51 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Potomac Avenue SE at 14th Street on July 1
Show Details |
07/01/2025 | 10/30/2025 |
C15 |
Stop Discontinued |
Permanent Bus Stop Closure: Pennsylvania Avenue SE at 15th Street on July 3
Show Details |
07/03/2025 | 11/03/2025 |
C37 |
Stop Discontinued |
Permanent Bus Stop Closure: Pennsylvania Avenue SE at 15th Street on July 3
Show Details |
07/03/2025 | 11/03/2025 |
D10 |
Stop Discontinued |
Permanent Bus Stop Closure: Pennsylvania Avenue SE at 15th Street on July 3
Show Details |
07/03/2025 | 11/03/2025 |
C37 |
Temporary Detour |
Temporary Detour: 41st St SE and Southern Ave on July 3rd
Show Details |
07/03/2025 | 12/03/2025 |
C31 |
Service Change |
Westbound C31 Routing Change Beginning on July 4
Show Details |
07/04/2025 | 10/06/2025 |
|
Elevator Closed |
On July 16, 2025, Metro began rehabilitating the elevator (C08X01) at Pentagon City Station. The work will take approximately two months to complete, and the elevator will be out of service during that time.
Show Details |
07/16/2025 | 09/23/2025 |
|
Rail Station Construction |
From Aug. 2-31, 2025, Branch Av will be closed as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
From Aug. 2-31, 2025, Suitland will be closed as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
From Aug. 2-31, 2025, Naylor Rd will be closed as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
From Aug. 2-31, 2025, Green Line service will terminate at Southern Av as part of Metro's Green Line Major Construction. Additionally, for two weekends, Aug. 9-10 and Aug. 16-17, 2025, Southern Av will be closed.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
For two weekends, Aug. 9-10 and Aug. 16-17, 2025, Congress Heights will be closed as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
For two weekends, Aug. 9-10 and Aug. 16-17, 2025, Green Line service will terminate at Anacostia as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
C81 |
Stop Relocation |
Temporary Bus Stop Relocation: Military Road NW at 14th St on July 11
Show Details |
07/11/2025 | 01/11/2026 |
M70 |
Stop Relocation |
Bus Stop Relocation: Old Georgetown Road at Commerce Lane on July 15
Show Details |
07/15/2025 | 11/15/2025 |
F23 |
Temporary Detour |
Temporary Detour: Rock the Block Events
Show Details |
07/25/2025 | 10/31/2025 |
A40 |
Stop Relocation |
Bus Stop Relocation: Columbia Pike Project, July 21
Show Details |
07/21/2025 | 10/15/2025 |
A49 |
Stop Relocation |
Bus Stop Relocation: Columbia Pike Project, July 21
Show Details |
07/21/2025 | 10/15/2025 |
F44 |
Stop Relocation |
Bus Stop Relocation: Columbia Pike Project, July 21
Show Details |
07/21/2025 | 10/15/2025 |
|
Rail Station Construction,Parking Changes |
On July 21, 2025, Arlington County/Metro began reconstruction of the Bus Loop. The work will be divided into three overall phases and will take approximately 15 months to complete.
Show Details |
07/21/2025 | 10/21/2026 |
D40 |
Stop Relocation |
Permanent Bus Stop Relocation: Georgia Avenue NW and Kennedy Street
Show Details |
07/28/2025 | 11/28/2025 |
D4X |
Stop Relocation |
Permanent Bus Stop Relocation: Georgia Avenue NW and Kennedy Street
Show Details |
07/28/2025 | 11/28/2025 |
D50 |
Temporary Bus Stop |
Temporary Bus Stop Closure: 14th Street NW and Jefferson Street
Show Details |
07/28/2025 | 11/28/2025 |
D5X |
Temporary Bus Stop |
Temporary Bus Stop Closure: 14th Street NW and Jefferson Street
Show Details |
07/28/2025 | 11/28/2025 |
P90 |
Stop Relocation |
Permanent Bus Stop Relocation: St Barnabas Road at Bedford Way
Show Details |
07/25/2025 | 11/25/2025 |
M12 |
Temporary Bus Stop |
Temporary Bus Stop Relocation: Twinbrook Station
Show Details |
07/27/2025 | 09/30/2025 |
P31 |
Stop Relocation |
Permanent Bus Stop Relocation: Merrimac Drive
Show Details |
07/27/2025 | 11/27/2025 |
|
Parking Changes |
Beginning Sunday, July 27, 2025, Metro will rehabilitate surface parking lots and the East Bus Loop at Twinbrook Station to enhance safety and improve the customer experience. During this work, customers should expect up to a 15% reduction in parking availability.
Show Details |
07/27/2025 | 11/30/2025 |
M12 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Twinbrook Station Bus Bay A on August 4
Show Details |
08/04/2025 | 10/04/2025 |
A40 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Westbound Columbia Pike on August 11
Show Details |
08/11/2025 | 10/11/2025 |
F44 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Westbound Columbia Pike on August 11
Show Details |
08/11/2025 | 10/11/2025 |
P24 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Good Luck Road at Cipriano Road
Show Details |
08/12/2025 | 12/12/2025 |
|
Rail Station Construction |
Metro is building a new mezzanine at the south end of the station, to connect Metro to the future Purple Line Bethesda Station. The mezzanine will not be available until Purple Line opens in 2027.
Show Details |
07/28/2025 | 09/30/2026 |
|
Elevator Closed |
This is a reminder that the elevators on both sides of the pedestrian bridge, that goes across East-West Hwy near Hyattsville Crossing Station, have been closed indefinitely.
Show Details |
08/11/2025 | 09/15/2025 |
P14 |
Stop Change |
Stop Change: Cunningham Dr at Pontiac St on August 11
Show Details |
08/15/2025 | 10/11/2025 |
P41 |
Stop Change |
Stop Change: Landover Rd at Brightseat Rd on August 14
Show Details |
08/15/2025 | 10/11/2025 |
C31 |
Stop Change |
Bus Stop Changes: Route C31 on August 18
Show Details |
08/18/2025 | 11/28/2025 |
C53 |
Stop Discontinued |
Permanent Bus Stop Closure: 8th St SE and D St SE
Show Details |
08/20/2025 | 12/31/2025 |
|
Escalator Closed |
On August 17, 2025, Metro began modernizing the escalator at the West Hyattsville Station. The work will take approximately two months to complete, and that escalator will be out of service during that time.
Show Details |
08/17/2025 | 12/07/2025 |
C53 |
Stop Relocation |
Bus Stop Relocation: 8th St SE at D St on August 22
Show Details |
08/22/2025 | 10/22/2025 |
A76 |
Temporary Detour |
Temporary Detour: Construction on N Fairfax Dr
Show Details |
08/24/2025 | 08/28/2025 |
A1X |
Temporary Detour |
Temporary Detour: A1X to Braddock Rd August 24
Show Details |
08/24/2025 | 11/22/2025 |
C85 |
Stop Discontinued |
Permanent Bus Stop Closure: Macarthur Blvd on August 22
Show Details |
08/22/2025 | 12/22/2025 |
D94 |
Stop Discontinued |
Permanent Bus Stop Closure: Macarthur Blvd on August 22
Show Details |
08/22/2025 | 12/22/2025 |
Route/Line | What's Happening | Issue | Start Date | End Date |
---|---|---|---|---|
|
Rail Station Construction |
Due to joint development and other construction activities, parking, traffic and pedestrian access may be impacted.
Show Details |
07/01/2019 | 12/31/2026 |
|
Escalator Closed |
In May 2024, Metro continued a major capital project replacing entrance escalators: three at Entrance B (6th St) from late May 2024 to June 2025 and three at Entrance C (9th St) from June 2025 to August 2026.
Show Details |
05/17/2024 | 08/31/2026 |
|
Rail Station Construction |
Additionally, MDOT MTA Purple Line construction crews continue to work on a new mezzanine that will connect the future station to Metro, MARC, and the transit center. Expect construction through 2026.
Show Details |
04/13/2023 | 05/01/2026 |
|
Entrance/Exit Inhibited |
In January 2023, Metro began a capital project to install a new staircase and canopy at Judiciary Square’s north entrance. The stairway is scheduled to open in spring 2025 and canopy construction will begin by fall 2025.
Show Details |
01/01/2023 | 12/31/2026 |
|
Elevator Closed,Escalator Closed |
In March 2024, Metro began a major capital project replacing three entrance escalators at Dupont Circle’s north entrance – all three are expected to be completed by fall 2025.
Show Details |
03/04/2024 | 10/31/2025 |
|
Rail Station Construction |
In June 2023, Metro began a major capital project to install two canopies above the station escalators.
Show Details |
06/01/2023 | 03/31/2026 |
|
Parking Changes |
50% of the Kiss & Ride Lot at Fort Totten Station closed for repairs. During this time, daily parking is available in the Park & Ride (rates apply).
Show Details |
09/01/2024 | 12/31/2025 |
|
Elevator Closed,Escalator Closed |
In Summer 2025, Metro will begin a major capital project replacing four entrance escalators at Gallery Place Station’s Entrance A (7th and F Street, NW).
Show Details |
05/12/2025 | 11/07/2025 |
|
Escalator Closed |
In January 2024, Metro began a major capital project replacing the four entrance escalators and four platform escalators at Rosslyn Station –all eight escalators are expected to be completed by May 2026.
Show Details |
01/02/2024 | 06/30/2026 |
|
Parking Changes |
In June 2024, Metro began reconfiguring the Kiss & Ride Lot and reopened the lower level of the Park & Ride Lot. Up to 85% of parking spaces in the Kiss & Ride Lot will close indefinitely; but daily parking is available in the Park & Ride (rates apply).
Show Details |
06/24/2024 | 12/31/2026 |
|
Parking Changes |
Metro is currently repairing the south parking garage. To facilitate this, up to 25% of spaces will be closed through late summer 2025. While we make improvements to enhance safety and deliver a better customer experience, expect reduced parking availability.
Show Details |
06/01/2024 | 09/30/2025 |
|
Escalator Closed |
In August 2024, Metro began a major capital project replacing six escalators at Crystal City – they will all be replaced by early September 2025.
Show Details |
08/05/2024 | 09/08/2025 |
|
Escalator Closed |
In September 2024, Metro began a major capital project replacing the three entrance escalators and one platform escalator at the east entrance.
The entire escalator replacement project is anticipated to be complete in Spring 2026.
Show Details |
09/30/2024 | 04/01/2026 |
P30 |
Temporary Detour |
Temporary Detour: MDOT MTA Purple Line Project on June 29
Show Details |
06/29/2025 | 09/05/2025 |
D90 |
Temporary Detour |
Temporary Detour: Construction on Cathedral Avenue NW on June 29
Show Details |
06/29/2025 | 10/29/2025 |
C85 |
Temporary Detour |
Temporary Detour: Construction on MacArthur Boulevard NW on June 29
Show Details |
06/29/2025 | 08/25/2025 |
D50 |
Temporary Bus Stop |
Temporary Bus Stop Closure: 14th Street NW at Decatur Street on June 29
Show Details |
06/29/2025 | 12/31/2025 |
D44 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Rock Creek Church Rd NW at Allison St on June 29
Show Details |
06/29/2025 | 12/01/2025 |
D74 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Rock Creek Church Rd NW at Allison St on June 29
Show Details |
06/29/2025 | 12/01/2025 |
F23 |
Temporary Detour |
Long Term Detour: Landmark West End Development on June 29
Show Details |
06/29/2025 | 12/31/2025 |
F24 |
Temporary Detour |
Long Term Detour: Landmark West End Development on June 29
Show Details |
06/29/2025 | 12/31/2025 |
A40 |
Stop Relocation |
Temporary Bus Stop Relocation: Columbia Pike at S Scott St on June 29
Show Details |
06/29/2025 | 08/28/2025 |
C51 |
Temporary Bus Stop |
Temporary Bus Stop Closure: New Jersey Avenue NW at Rhode Island Avenue on June 29
Show Details |
06/29/2025 | 09/30/2025 |
P42 |
Temporary Detour |
Temporary Detour: Construction on Powhatan Street Bridge on June 30
Show Details |
06/29/2025 | 10/29/2025 |
D36 |
Stop Discontinued |
Permanent Bus Stop Closure: 4th Street NE and Rhode Island Avenue on June 29
Show Details |
06/29/2025 | 10/29/2025 |
D36 |
Stop Change |
Permanent Bus Stop Adjustment: 13th Street and I Street NW on June 29
Show Details |
06/29/2025 | 10/29/2025 |
C81 |
Temporary Detour |
Temporary Detour: Construction on Kennedy Street NW on June 30
Show Details |
06/30/2025 | 10/30/2025 |
C41 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Potomac Avenue SE at 14th Street on July 1
Show Details |
07/01/2025 | 10/30/2025 |
C51 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Potomac Avenue SE at 14th Street on July 1
Show Details |
07/01/2025 | 10/30/2025 |
C15 |
Stop Discontinued |
Permanent Bus Stop Closure: Pennsylvania Avenue SE at 15th Street on July 3
Show Details |
07/03/2025 | 11/03/2025 |
C37 |
Stop Discontinued |
Permanent Bus Stop Closure: Pennsylvania Avenue SE at 15th Street on July 3
Show Details |
07/03/2025 | 11/03/2025 |
D10 |
Stop Discontinued |
Permanent Bus Stop Closure: Pennsylvania Avenue SE at 15th Street on July 3
Show Details |
07/03/2025 | 11/03/2025 |
C37 |
Temporary Detour |
Temporary Detour: 41st St SE and Southern Ave on July 3rd
Show Details |
07/03/2025 | 12/03/2025 |
C31 |
Service Change |
Westbound C31 Routing Change Beginning on July 4
Show Details |
07/04/2025 | 10/06/2025 |
|
Elevator Closed |
On July 16, 2025, Metro began rehabilitating the elevator (C08X01) at Pentagon City Station. The work will take approximately two months to complete, and the elevator will be out of service during that time.
Show Details |
07/16/2025 | 09/23/2025 |
|
Rail Station Construction |
From Aug. 2-31, 2025, Branch Av will be closed as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
From Aug. 2-31, 2025, Suitland will be closed as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
From Aug. 2-31, 2025, Naylor Rd will be closed as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
From Aug. 2-31, 2025, Green Line service will terminate at Southern Av as part of Metro's Green Line Major Construction. Additionally, for two weekends, Aug. 9-10 and Aug. 16-17, 2025, Southern Av will be closed.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
For two weekends, Aug. 9-10 and Aug. 16-17, 2025, Congress Heights will be closed as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
|
Rail Station Construction |
For two weekends, Aug. 9-10 and Aug. 16-17, 2025, Green Line service will terminate at Anacostia as part of Metro's Green Line Major Construction.
Show Details |
08/02/2025 | 08/31/2025 |
C81 |
Stop Relocation |
Temporary Bus Stop Relocation: Military Road NW at 14th St on July 11
Show Details |
07/11/2025 | 01/11/2026 |
M70 |
Stop Relocation |
Bus Stop Relocation: Old Georgetown Road at Commerce Lane on July 15
Show Details |
07/15/2025 | 11/15/2025 |
F23 |
Temporary Detour |
Temporary Detour: Rock the Block Events
Show Details |
07/25/2025 | 10/31/2025 |
A40 |
Stop Relocation |
Bus Stop Relocation: Columbia Pike Project, July 21
Show Details |
07/21/2025 | 10/15/2025 |
A49 |
Stop Relocation |
Bus Stop Relocation: Columbia Pike Project, July 21
Show Details |
07/21/2025 | 10/15/2025 |
F44 |
Stop Relocation |
Bus Stop Relocation: Columbia Pike Project, July 21
Show Details |
07/21/2025 | 10/15/2025 |
|
Rail Station Construction,Parking Changes |
On July 21, 2025, Arlington County/Metro began reconstruction of the Bus Loop. The work will be divided into three overall phases and will take approximately 15 months to complete.
Show Details |
07/21/2025 | 10/21/2026 |
D40 |
Stop Relocation |
Permanent Bus Stop Relocation: Georgia Avenue NW and Kennedy Street
Show Details |
07/28/2025 | 11/28/2025 |
D4X |
Stop Relocation |
Permanent Bus Stop Relocation: Georgia Avenue NW and Kennedy Street
Show Details |
07/28/2025 | 11/28/2025 |
D50 |
Temporary Bus Stop |
Temporary Bus Stop Closure: 14th Street NW and Jefferson Street
Show Details |
07/28/2025 | 11/28/2025 |
D5X |
Temporary Bus Stop |
Temporary Bus Stop Closure: 14th Street NW and Jefferson Street
Show Details |
07/28/2025 | 11/28/2025 |
P90 |
Stop Relocation |
Permanent Bus Stop Relocation: St Barnabas Road at Bedford Way
Show Details |
07/25/2025 | 11/25/2025 |
M12 |
Temporary Bus Stop |
Temporary Bus Stop Relocation: Twinbrook Station
Show Details |
07/27/2025 | 09/30/2025 |
P31 |
Stop Relocation |
Permanent Bus Stop Relocation: Merrimac Drive
Show Details |
07/27/2025 | 11/27/2025 |
|
Parking Changes |
Beginning Sunday, July 27, 2025, Metro will rehabilitate surface parking lots and the East Bus Loop at Twinbrook Station to enhance safety and improve the customer experience. During this work, customers should expect up to a 15% reduction in parking availability.
Show Details |
07/27/2025 | 11/30/2025 |
M12 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Twinbrook Station Bus Bay A on August 4
Show Details |
08/04/2025 | 10/04/2025 |
A40 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Westbound Columbia Pike on August 11
Show Details |
08/11/2025 | 10/11/2025 |
F44 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Westbound Columbia Pike on August 11
Show Details |
08/11/2025 | 10/11/2025 |
P24 |
Temporary Bus Stop |
Temporary Bus Stop Closure: Good Luck Road at Cipriano Road
Show Details |
08/12/2025 | 12/12/2025 |
|
Rail Station Construction |
Metro is building a new mezzanine at the south end of the station, to connect Metro to the future Purple Line Bethesda Station. The mezzanine will not be available until Purple Line opens in 2027.
Show Details |
07/28/2025 | 09/30/2026 |
|
Elevator Closed |
This is a reminder that the elevators on both sides of the pedestrian bridge, that goes across East-West Hwy near Hyattsville Crossing Station, have been closed indefinitely.
Show Details |
08/11/2025 | 09/15/2025 |
P14 |
Stop Change |
Stop Change: Cunningham Dr at Pontiac St on August 11
Show Details |
08/15/2025 | 10/11/2025 |
P41 |
Stop Change |
Stop Change: Landover Rd at Brightseat Rd on August 14
Show Details |
08/15/2025 | 10/11/2025 |
C31 |
Stop Change |
Bus Stop Changes: Route C31 on August 18
Show Details |
08/18/2025 | 11/28/2025 |
P41 |
Temporary Detour |
Temporary Detour: Washington Commanders vs Baltimore Ravens on August 23
Show Details |
08/23/2025 | 08/23/2025 |
P61 |
Temporary Detour |
Temporary Detour: Washington Commanders vs Baltimore Ravens on August 23
Show Details |
08/23/2025 | 08/23/2025 |
C53 |
Stop Discontinued |
Permanent Bus Stop Closure: 8th St SE and D St SE
Show Details |
08/20/2025 | 12/31/2025 |
|
Escalator Closed |
On August 17, 2025, Metro began modernizing the escalator at the West Hyattsville Station. The work will take approximately two months to complete, and that escalator will be out of service during that time.
Show Details |
08/17/2025 | 12/07/2025 |
C85 |
Temporary Detour |
Temporary Detour: Construction on Edmund St NW
Show Details |
08/20/2025 | 08/24/2025 |
D96 |
Temporary Detour |
Temporary Detour: Construction on Edmund St NW
Show Details |
08/20/2025 | 08/24/2025 |
A58 |
Temporary Detour |
Temporary Detour: Construction Wilson Boulevard August 24
Show Details |
08/24/2025 | 08/24/2025 |
A76 |
Temporary Detour |
Temporary Detour: Construction Wilson Boulevard August 24
Show Details |
08/24/2025 | 08/24/2025 |
F62 |
Temporary Detour |
Temporary Detour: Construction Wilson Boulevard August 24
Show Details |
08/24/2025 | 08/24/2025 |
C53 |
Stop Relocation |
Bus Stop Relocation: 8th St SE at D St on August 22
Show Details |
08/22/2025 | 10/22/2025 |
C53 |
Temporary Detour |
Temporary Detour: Construction on Florida Ave Between 3rd St NE and 4th St on August 23
Show Details |
08/23/2025 | 08/23/2025 |
A76 |
Temporary Detour |
Temporary Detour: Construction on N Fairfax Dr
Show Details |
08/24/2025 | 08/28/2025 |
A1X |
Temporary Detour |
Temporary Detour: A1X to Braddock Rd August 24
Show Details |
08/24/2025 | 11/22/2025 |
C85 |
Stop Discontinued |
Permanent Bus Stop Closure: Macarthur Blvd on August 22
Show Details |
08/22/2025 | 12/22/2025 |
D94 |
Stop Discontinued |
Permanent Bus Stop Closure: Macarthur Blvd on August 22
Show Details |
08/22/2025 | 12/22/2025 |